Open for BidsPROCUREMENT
South Carolina statewide
Highways and bridges, Transportation
Statewide highway construction letting with multiple design-bid-build proposals. This is one letting notice; individual contracts must be reviewed separately.
- Issuing agency
- South Carolina Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 10, 2026 · 2:00 pm EST (America/New_York)
Source checked: 2026-10-19T12:57:21.316Z
Open for BidsPROCUREMENT
Nationwide U.S. and Canada
Cooperative contract solicitation for laboratory and science equipment, supplies, related technology and services.
- Issuing agency
- Sourcewell
- Reported contract value
- Not verified
- Submission deadline
- Nov 10, 2026 · 3:30 pm CST (America/Chicago)
Source checked: 2026-10-25
Open for BidsPROCUREMENT
Oran, Missouri
Construction of a new water plant, standby power, a new well and controls, replacement pumping equipment and controls at an existing well, and connecting pipeline work.
- Issuing agency
- City of Oran
- Reported contract value
- Not verified
- Submission deadline
- Nov 19, 2026 · 2:00 pm CST (America/Chicago)
Source checked: 2026-10-25
Open for BidsPROCUREMENT
Mercer, Sullivan and Putnam counties, Missouri
Roads & Bridges
Resurface approximately 40.008 miles across seven routes in Mercer, Sullivan and Putnam counties.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Laclede County, Missouri
Highways and bridges, Transportation
Resurface and rebuild I-44 pavement from the Route 133 interchange to Route F and rehabilitate or replace bridge superstructures over the Gasconade River and Bear Creek.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Laclede County, Missouri
Roads & Bridges
Resurface and rebuild approximately 4.636 miles of I-44 pavement from the Route 133 interchange to Route F.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
St. Louis County, Missouri
Highways and bridges, Transportation
Rehabilitate seven bridges at the I-255/I-55 interchange across approximately 0.699 mile.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Cedar, Polk and Dade counties, Missouri
Highways and bridges, Transportation
Grading, pavement, drainage, bridge and culvert replacement along Route 32 near Bolivar and grading, pavement and drainage on Route 160 in Dade County.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Benton and Henry counties, Missouri
Roads & Bridges
Resurface Route C and Route U and resurface/add shoulders on Route PP in Benton and Henry counties.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Benton County, Missouri
Roads & Bridges
Resurface approximately 2.457 miles of Route UU from the beginning of state maintenance to Route 7 near Warsaw.
- Issuing agency
- Missouri Department of Transportation
- Reported contract value
- Not verified
- Submission deadline
- Nov 20, 2026 · 11:00 am CST (America/Chicago)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Nationwide U.S. and Canada
Cooperative contract solicitation for material-processing and recycling equipment, related products and services.
- Issuing agency
- Sourcewell
- Reported contract value
- Not verified
- Submission deadline
- Nov 24, 2026 · 3:30 pm CST (America/Chicago)
Source checked: 2026-10-25
Open for BidsPROCUREMENT
Blue Lake, California
Infrastructure Technology
Conduct two penetration tests of the Tribe’s information-technology systems under a Tribal Homeland Security Grant Program-supported engagement.
- Issuing agency
- Blue Lake Rancheria
- Reported contract value
- Not verified
- Submission deadline
- Nov 30, 2026 · 5:00 pm PST (America/Los_Angeles)
Source checked: 2026-10-22T12:00:00Z
Open for BidsPROCUREMENT
Nationwide U.S. and Canada
Cooperative contract solicitation for scoreboards, digital displays, video boards and related services for Sourcewell participating public and nonprofit entities.
- Issuing agency
- Sourcewell
- Reported contract value
- Not verified
- Submission deadline
- Dec 1, 2026 · 3:30 pm CST (America/Chicago)
Source checked: 2026-10-25
Project IntelligencePROJECT
Washington and Oregon; corridor extends to Vancouver, British Columbia
Rail and transit, Highways and bridges, Transportation
Integrated planning evaluates high-speed rail between Portland, Seattle and Vancouver alongside an I-5 master plan for Washington, coordinating highway, rail, transit and airport connections.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Clinton, Whidbey Island, Washington
Ports and maritime, Transportation
A new overhead walkway and second-level waiting area will allow walk-on passengers and vehicles to load separately at the Clinton ferry terminal.
- Owner / developer
- Washington State Ferries
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Ephrata, Washington
Transportation
A proposed roundabout on SR 28 near Alder Street will improve intersection safety and incorporate pedestrian facilities identified through a Complete Streets review.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Puget Sound, Washington
Ports and maritime, Transportation
A long-term fleet and terminal program combines new hybrid-electric ferries, shoreside charging, energy storage and selected vessel conversions.
- Owner / developer
- Washington State Ferries
- Reported project value
- $6B
- Project stage
- Under construction
Source checked: 2026-10-31
Project IntelligencePROJECT
Bothell, Washington
Transportation
Improvements along 4.5 miles of I-405 extend express toll lanes, add three Stride bus stations and direct-access ramps, and address stormwater, noise and fish passage.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-31
Project IntelligencePROJECT
Lynnwood, Snohomish County, Washington
Transportation
A new northbound I-5 auxiliary lane will connect the I-405 ramp to the 164th Street Southwest exit, with ramp changes, resurfacing and a southbound noise wall.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Kirkland, Washington
Transportation
A three-level interchange and inline Stride bus station will connect local streets, pedestrians and cyclists with express toll lanes and regional transit.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-31
Project IntelligencePROJECT
Renton, Washington
Resilience and flood protection
New stream channels and culvert changes will reconnect two tributaries to Lake Washington, improve fish access and relieve downstream flow restrictions.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
King, Snohomish, Skagit and Whatcom counties, Washington
Transportation
Targeted replacement of deteriorated concrete panels on I-5 and I-90 will extend pavement life and improve ride quality.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Clark County, Washington
Transportation
Roundabouts, replacement I-5 bridges, fish-passage improvements and safer walking and cycling connections will modernize the Northeast 179th Street interchange.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- $86M
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Lakewood, Washington
Transportation
A 1.3-mile shared-use path and new bridge will connect Tillicum with other Lakewood neighborhoods, with access for pedestrians, cyclists and emergency vehicles.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- $31.5M
- Project stage
- Under construction
Source checked: 2026-10-31