INFRADAY PROJECTS · PROCUREMENT NOTICE · DNR project DW-291425-01
Oran seeks bids for $4 million water-supply improvements
Oran, Missouri
Source checked: 2026-11-15T15:01:06Z · Procurement verification recorded: 2026-11-15T15:01:06Z
Saved opportunities appear in your existing research workspace. Saving does not change email preferences.
- Solicitation reference
- DNR project DW-291425-01
- Deadline timezone
- America/Chicago
- Recorded contract duration
- 480 consecutive calendar days after notice to proceed
Overview
Construction of a new water plant, standby power, a new well and controls, replacement pumping equipment and controls at an existing well, and connecting pipeline work.
Recorded scope of work
- New water plant
- Standby power
- New well and controls
- Existing-well pump and controls replacement
- Pipeline connections
Contacts
A source-verified professional contact has not been recorded for this notice.
Official procurement contact route ↗Use the contact and questions procedure in the solicitation. Project or company contacts do not replace the designated procurement channel.
Opportunities & Contracts
Solicitation Open
Review the official solicitation, current addenda, eligibility and submission instructions before preparing a response. Use the issuing agency’s designated questions channel.
- Solicitation number
- DNR project DW-291425-01
- Procurement type
- RFP / bid opportunity
- Recorded qualifications
- Bid security as specified in the Instructions to Bidders; applicable state/federal wage requirements, OSHA training and work-authorization requirements apply.
- Submission procedure
- Separate sealed bids are due at Oran City Hall, 1200 State Highway W, Oran, Missouri 63771.
Companies Involved
- Issuing agency
- City of Oran
The issuing agency is shown above. Contractor, supplier and award relationships require separate source evidence.
Budget & Funding
- Reported contract value
- $4M
- Recorded value basis
- Approximately $4,000,000 anticipated total bid price
This figure concerns the notice or contract where explicitly recorded. It is not automatically the whole-project budget, funding commitment or awarded contract price.
Timeline & Milestones
- Submission deadline
- Nov 19, 2026 · 2:00 pm CST (America/Chicago)
- Deadline timezone
- America/Chicago
- Pre-bid meeting
- No pre-bid meeting is stated in the Missouri DNR public notice reviewed.
- Recorded contract duration
- 480 consecutive calendar days after notice to proceed
A notice deadline is not a construction-start date. Durations measured from notice to proceed do not establish a calendar completion date.
Documents & Resources
Official notice and current documents ↗One lump-sum contract. Digital documents are available without charge by requesting a download link from Waters Engineering; printed sets cost $500, nonrefundable. The project uses Missouri State Revolving Fund and federal capitalization-grant assistance. Missouri DNR is not a party to the construction contract.
Updates & Intelligence
Recommended next step
Review the official solicitation, current addenda, eligibility and submission instructions before preparing a response. Use the issuing agency’s designated questions channel.
- Record originally published
- 2026-10-25 08:20:03
- Record last edited
- 2026-11-15 10:02:33
- Source check recorded
- 2026-11-15T15:01:06Z
- Procurement verification recorded
- 2026-11-15T15:01:06Z
These dates track the record and its source checks. Refer to the official notice for procurement changes and addenda.
Original notice details
The City of Oran is requesting sealed bids for water-supply improvements under Missouri DNR project DW-291425-01. The work includes a new water plant, standby power units, a new well with controls, replacement pumping equipment and controls at an existing well, and pipeline work needed to connect and complete the system.
Bids are due at Oran City Hall on November 19, 2026 at 2 p.m. local time. Missouri DNR’s notice estimates the total bid price at approximately $4 million and anticipates substantial completion within 480 consecutive calendar days after notice to proceed.
The project uses Missouri State Revolving Fund and federal capitalization-grant financing. Wage, bid-security and work-authorization requirements apply; bidders should obtain the complete documents and all addenda from the issuing engineer.
Official source reviewed November 15, 2026: Missouri DNR bid notice.
