Infraday iD. logo

Connecting infrastructure leaders since 2017.

THE BUSINESS OF
INFRASTRUCTURE

Infraday Projects

Infrastructure projects, procurement and contracting intelligence.

category: early

262 opportunitiesProjects and procurement, together
Project IntelligencePROJECT

Highway 10 Detroit Lakes to Frazee Resurfacing

Detroit Lakes to Frazee, Minnesota

Transportation, Highways and bridges

Highway 10 will receive pavement resurfacing and improvements at East Shore Drive, McHugh Road and 290th Avenue.

Owner / developer
Minnesota Department of Transportation
Reported project value
$11.9M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 10 Moorhead to Dilworth Reconstruction

Moorhead to Dilworth, Minnesota

Transportation, Highways and bridges

Reconstruction between 13th and 34th streets includes concrete pavement, signal replacement, pedestrian improvements, access changes and nearby Highway 75 resurfacing.

Owner / developer
Minnesota Department of Transportation
Reported project value
$20M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 10 New York Mills to Bluffton Resurfacing

New York Mills to Bluffton, Minnesota

Transportation, Highways and bridges

Eastbound Highway 10 resurfacing will extend to 620th Avenue east of Bluffton, including replacement of approach panels at the Oak Creek bridge.

Owner / developer
Minnesota Department of Transportation
Reported project value
$5.5M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 10 Rural Royalton Resurfacing and Halfway Crossing

Morrison and Benton counties, Minnesota

Transportation, Highways and bridges

Resurfacing of rural Highway 10 on both sides of Royalton includes drainage repairs and a J-turn at the Halfway Crossing intersection.

Owner / developer
Minnesota Department of Transportation
Reported project value
$29M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 12 and County Road 34 Litchfield Roundabout

Litchfield, Minnesota

Transportation, Highways and bridges

A single-lane roundabout with accessible pedestrian facilities will improve safety and traffic flow at Highway 12 and Meeker County Road 34.

Owner / developer
Minnesota Department of Transportation
Reported project value
$4.2M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Pure Water Antelope Valley

Palmdale, California

Water and wastewater

Advanced purification of recycled water, groundwater injection wells and connecting pipelines will create a local water supply. A demonstration facility supports testing ahead of the full-scale treatment plant.

Owner / developer
Palmdale Water District
Reported project value
Not verified
Project stage
Design

Source checked: 2026-10-31

Project IntelligencePROJECT

Cayuga Solar

Lansing, Tompkins County, New York

Renewable energy

A solar energy facility proposed in Lansing; capacity is not stated in the reviewed ORES listing.

Owner / developer
AES Clean Energy Development, LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

Addison Solar

Addison, Campbell and Erwin, Steuben County, New York

Renewable energy

A proposed 120 MW solar energy facility across Addison, Campbell and Erwin.

Owner / developer
Addison Solar, LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

Alabama Solar

Alabama, Batavia and Oakfield, Genesee County, New York

Renewable energy

A proposed 130 MW solar energy facility across Alabama, Batavia and Oakfield.

Owner / developer
Alabama Solar Park LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

Town Line Solar & Storage

Thompson and Forestburgh, Sullivan County, New York

Renewable energy

A proposed 200 MW solar facility with 100 MW of energy storage in Thompson and Forestburgh.

Owner / developer
RWE Solar Development, LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

Little Salmon Solar

Fort Covington and Westville, Franklin County, New York

Renewable energy

A proposed 200 MW solar energy facility in Fort Covington and Westville.

Owner / developer
Little Salmon Solar, LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

North Country Wind

Bellmont, Burke and Chateaugay, Franklin County; Clinton, Clinton County, New York

Renewable energy

A proposed wind generation project spanning parts of Franklin and Clinton counties. Capacity is not specified in the reviewed ORES listing.

Owner / developer
North Country Wind, LLC (permit applicant)
Reported project value
Not verified
Project stage
Permitting

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 13 Savage to Burnsville Reconstruction

Savage and Burnsville, Minnesota

Transportation, Highways and bridges

Reconstruct Highway 13 and intersections from Quentin Avenue to Washburn Avenue and at Nicollet Avenue, with pedestrian, drainage and utility improvements.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Sibley Memorial Highway Mendota Heights Rehabilitation

Mendota Heights, Minnesota

Transportation, Highways and bridges

Repave the former Highway 13 alignment between Mendota Heights Road and Great River Road, replace culverts, repair erosion and improve accessible pedestrian ramps before transfer to the city.

Owner / developer
Minnesota Department of Transportation
Reported project value
$2.3M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 14 and Broadway Avenue Rochester Safety Improvements

Rochester, Minnesota

Transportation, Highways and bridges

Reconstruct the Highway 14 and Broadway Avenue intersection area with revised turn lanes, shorter pedestrian crossings, raised crosswalks, sidewalks, trails and new signals.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 19 Northfield Reconstruction and Repaving

Northfield, Minnesota

Transportation, Highways and bridges

Reconstruct Highway 19 from Decker Avenue to the Union Pacific tracks and repave east to Highway 3, adding a center turn lane, a proposed Armstrong Road roundabout and a…

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 Milaca Reconstruction

Milaca, Mille Lacs County, Minnesota

Transportation, Highways and bridges

Reconstruct Highway 23 from the Rum River bridge to County Road 2, improve intersection access, install roundabouts and add a north-side multi-use trail.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 Mission Creek Bridge Replacement

Duluth, St. Louis County, Minnesota

Transportation, Highways and bridges

Replace the Mission Creek bridge and reconstruct Highway 23 between the St. Louis River and a point west of West 5th Street.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highways 23 and 9 New London Interchange

New London, Kandiyohi County, Minnesota

Transportation, Highways and bridges

Build a Highway 23 and Highway 9 interchange and realign County Road 40 in coordination with Kandiyohi County.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Design

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 and Tiger Drive Marshall J-Turn

Marshall, Minnesota

Transportation, Highways and bridges

Construct a reduced-conflict J-turn intersection at Highway 23 and Tiger Drive to improve safety and drainage.

Owner / developer
Minnesota Department of Transportation
Reported project value
$2.6M
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 Rockville County Road 8 J-Turn

Rockville, Stearns County, Minnesota

Transportation, Highways and bridges

Install a J-turn at Highway 23 and County Road 8, close the median crossover and add a pedestrian crossing in the median.

Owner / developer
Minnesota Department of Transportation
Reported project value
Not verified
Project stage
Planning

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 Waite Park Bel Clare Drive J-Turn

Waite Park, Stearns County, Minnesota

Transportation, Highways and bridges

Install a J-turn at Bel Clare Drive, close the center crossover and add median pedestrian crossings.

Owner / developer
Minnesota Department of Transportation
Reported project value
$1.2M
Project stage
Design

Source checked: 2026-10-31

Project IntelligencePROJECT

Highway 23 Waite Park Corridor Rehabilitation

Waite Park and St. Cloud, Stearns County, Minnesota

Transportation, Highways and bridges

Resurface and reconstruct Highway 23 from Highway 15 and Second Street South to Crossing Drive, replace five signal systems and improve pedestrian facilities, lighting and medians.

Owner / developer
Minnesota Department of Transportation
Reported project value
$12.1M
Project stage
Planning

Source checked: 2026-10-31

How opportunities are classified

Open Bids require an officially sourced, verified deadline with its time zone and verification within 14 days. Passed deadlines are excluded automatically. Upcoming Procurement requires a dated, sourced verification. Early-stage means a recorded planning, concept, design, environmental or permitting stage. Recently Awarded requires a sourced award dated within 30 days. Major Capital Projects have a reported whole-project minimum of $1 billion. A source check is separate from verification of a fact.

Discover infrastructure projects, contracts, and business opportunities across the United States. Find who’s involved, what’s coming next, and how to pursue the work.

You’re offline. Reconnect to load the latest Infraday updates.