Project IntelligencePROJECT
Washington and Oregon; corridor extends to Vancouver, British Columbia
Rail and transit, Highways and bridges, Transportation
Integrated planning evaluates high-speed rail between Portland, Seattle and Vancouver alongside an I-5 master plan for Washington, coordinating highway, rail, transit and airport connections.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Clinton, Whidbey Island, Washington
Ports and maritime, Transportation
A new overhead walkway and second-level waiting area will allow walk-on passengers and vehicles to load separately at the Clinton ferry terminal.
- Owner / developer
- Washington State Ferries
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Ephrata, Washington
Transportation
A proposed roundabout on SR 28 near Alder Street will improve intersection safety and incorporate pedestrian facilities identified through a Complete Streets review.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Lynnwood, Snohomish County, Washington
Transportation
A new northbound I-5 auxiliary lane will connect the I-405 ramp to the 164th Street Southwest exit, with ramp changes, resurfacing and a southbound noise wall.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Renton, Washington
Resilience and flood protection
New stream channels and culvert changes will reconnect two tributaries to Lake Washington, improve fish access and relieve downstream flow restrictions.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
King, Snohomish, Skagit and Whatcom counties, Washington
Transportation
Targeted replacement of deteriorated concrete panels on I-5 and I-90 will extend pavement life and improve ride quality.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Clark County, Washington
Transportation
Roundabouts, replacement I-5 bridges, fish-passage improvements and safer walking and cycling connections will modernize the Northeast 179th Street interchange.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- $86M
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Marysville, Washington
Transportation
The study evaluates whether a new I-5 interchange at 156th Street Northeast is needed to improve access to north Marysville and the Smokey Point employment area.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Clark County near Woodland, Washington
Transportation, Highways and bridges
The project will replace the aging northbound I-5 bridge over the East Fork Lewis River, Paradise Point State Park and Northwest Toenjes Road.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Thurston and Pierce counties, Washington
Transportation, Highways and bridges
Environmental review examines I-5 improvements across the Nisqually River Delta, including bridge alternatives, mobility, flood resilience and a shared-use path.
- Owner / developer
- Washington State Department of Transportation
- Reported project value
- Not verified
- Project stage
- Permitting
Source checked: 2026-10-31
Project IntelligencePROJECT
Northome, Minnesota
Transportation
Pavement reconstruction, storm sewers, sidewalks and curb-and-gutter improvements will renew Highways 1 and 46 within Northome.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $2.9M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Crookston, Minnesota
Transportation, Highways and bridges
Downtown corridor improvements combine pavement repairs, lane reconfiguration, pedestrian and cycling features, crossing changes and lighting upgrades.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Polk County, Minnesota
Transportation, Highways and bridges
About 11 miles of westbound Highway 2 will be resurfaced, with reconstruction of intersections in McIntosh.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $6.8M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Proctor, Minnesota
Transportation, Highways and bridges
Pavement rehabilitation along 4.8 miles of Highway 2 includes accessibility improvements and replacement of the Boundary Avenue traffic signal.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $9.3M
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Warba, Minnesota
Transportation, Highways and bridges
Road resurfacing, pedestrian and bicycle improvements, traffic calming and replacement of the Swan River bridge deck will improve Highway 2 through Warba.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $4.5M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
East Grand Forks, Minnesota
Transportation, Highways and bridges
Highway 2B reconstruction and resurfacing between Demers Avenue and Highway 2 includes sidewalk upgrades and a new shared-use path.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $7.7M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Minneapolis, Minnesota
Transportation, Highways and bridges
Protected bicycle lanes, shorter pedestrian crossings, pavement work, curb changes and new signals will improve Third Avenue South between Washington Avenue and First Street South.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $1.9M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Maplewood, Minnesota
Transportation, Highways and bridges
A four-to-three-lane conversion on Stillwater Road includes signal replacement, accessible curbs, a new trail and drainage improvements.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $3.7M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
St. Paul, Minnesota
Transportation, Highways and bridges
Pavement renewal, accessibility, transit, drainage, sidewalk, lighting and signal improvements are being developed for West Seventh Street.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Hollywood Township, Minnesota
Transportation, Highways and bridges
A roundabout and accessible sidewalks will replace the Highway 7 and County Road 33 intersection; the Highway 7 connection at 53rd Street will become a cul-de-sac.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
St. Bonifacius, Shorewood and Minnetonka, Minnesota
Transportation, Highways and bridges
Pavement preservation, cable median barriers, intersection improvements, trail connections and replacement of the Mill Street bridge will upgrade this Highway 7 corridor.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $48.6M
- Project stage
- Design
Source checked: 2026-10-31
Project IntelligencePROJECT
Montevideo, Minnesota
Transportation
Resurfacing and accessible pedestrian improvements will renew Highways 7 and 29, with removal of an eastbound truck climbing lane to reduce merging conflicts.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $3.1M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Hopkins and St. Louis Park, Minnesota
Transportation, Highways and bridges
Three bridges will receive deck or surface repairs, with a new trail and retaining wall connecting Cambridge Street to the Cedar Lake Regional Trail.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $8.4M
- Project stage
- Planning
Source checked: 2026-10-31
Project IntelligencePROJECT
Cushing, Morrison County, Minnesota
Transportation, Highways and bridges
Intersection changes at county roads 11 and 16 include restricted crossing movements, a J-turn design, longer turn lanes, lighting and pedestrian median crossings.
- Owner / developer
- Minnesota Department of Transportation
- Reported project value
- $1.9M
- Project stage
- Design
Source checked: 2026-10-31