Find infrastructure projects, RFPs, bids, and contract opportunities.
Find procurement opportunities
37 opportunities available
Posted dates show when each opportunity was added to Infraday. Featured opportunities appear first; other listings are newest first. Confirm deadlines and addenda in the official notice.
Submission deadline: Nov 19, 2026 · 2:00 pm CST (America/Chicago)
Construction of a new water plant, standby power, a new well and controls, replacement pumping equipment and controls at an existing well, and connecting pipeline work.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Construction of bi-directional turn lane with HMA resurfacing and widening on IL 159 (Main St.) from Barker St. to Stonefield Dr. in the village of Smithton. Work includes storm sewers, curb and gutter, ADA ramps, PCC shared-use path and other required work.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Construction of roundabout at the intersection of IL 162 and Troy Rd. in the city of Troy. Work includes PCC pavement, storm sewer, curb and gutter, roadway lighting and pavement markings.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Widening and resurfacing of W. White Oaks Dr. from Wabash Ave. to Cascade Dr. in the city of Springfield. Work includes the construction of a roundabout intersection at W. White Oaks Dr./Cascade Dr. intersection, sidewalks, shared-use path, curb and gutter, storm sewer…
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
4 miles of patching, resurfacing, concrete curb and gutter installation, storm sewer, culvert extensions, earthwork, and drainage improvements on IL 104 from 0.8 miles southwest of CH 1 (Woodson/Franklin Road) to 0.7 miles west of IL 111.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Removal and replacement of bridge structure (SN 050-0254) which carries Water St over Indian Creek located about 0.4 miles north of US 34 in Earlville.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Replacement of the bridge carrying 15th Ave. over the Rock River in the city of Rockford. Additional work consists of the reconstruction of the approaches, bridge lighting, traffic signals, sidewalk, water main replacement and landscaping.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Construction of a PCC shared-use path along 25th Avenue in the city of Moline. Work includes pavement patching, retaining wall, water service adjustments, ADA ramps and other required work.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Resurface Prairie Ave. from Brookfield Ave. to 31st St. in the village of Brookfield. Additional work consists of sidewalk replacement, curb and gutter replacement, water main improvements, combined sewer replacement, pavement markings and lighting improvements.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Reconstruction of bridge superstructure carrying Theodore St. over Rock Run Creek in the city of Joliet. Additional work includes HMA pavement, sidewalk, shared-use path, storm sewer, retaining wall and other required work.