Find infrastructure projects, RFPs, bids, and contract opportunities.
Find procurement opportunities
26 opportunities available
Posted dates show when each opportunity was added to Infraday. Featured opportunities appear first; other listings are newest first. Confirm deadlines and addenda in the official notice.
Submission deadline: Nov 19, 2026 · 2:00 pm CST (America/Chicago)
Construction of a new water plant, standby power, a new well and controls, replacement pumping equipment and controls at an existing well, and connecting pipeline work.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Construction of roundabout at the intersection of IL 162 and Troy Rd. in the city of Troy. Work includes PCC pavement, storm sewer, curb and gutter, roadway lighting and pavement markings.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Improvements at Matthiessen State Park Annex consist of resurfacing E. 494th Rd with a concrete surface; construction of a new HMA surface parking lot with lighting; access gates and signage; drainage improvements; and other associated work. Gross and net length approx. 0.5…
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Replacement of the bridge carrying 15th Ave. over the Rock River in the city of Rockford. Additional work consists of the reconstruction of the approaches, bridge lighting, traffic signals, sidewalk, water main replacement and landscaping.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Reconstruction of the eastbound lanes and shoulders of the Rock Island-Milan Parkway from US 67 to 78th Ave. in Rock Island County. Work includes PCC pavement, raised median replacement, intersection lighting, striping and other required work.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lighting, and culvert replacement at the IL 5/I-74 interchange and extending on IL 5 from 16th St to 0.1 miles west of 38th St in Moline and on I-74 from 0.9 miles south of…
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Rd. to the eastern terminus of Pembroke Ave. and Stonington Ave. from Hassell Rd. to…
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Resurface Prairie Ave. from Brookfield Ave. to 31st St. in the village of Brookfield. Additional work consists of sidewalk replacement, curb and gutter replacement, water main improvements, combined sewer replacement, pavement markings and lighting improvements.
Submission deadline: Nov 6, 2026 · 12:00 pm CST (America/Chicago)
Construction of a bridge to carry Randall Rd. over the CN Railway, reconstruction/realignment of the intersection at Hopps Rd., additional through lanes on Randall Rd. and the construction of a shared-use path. Additional work includes storm sewer, water main, curb and gutter,…