Project IntelligencePROJECT
Los Angeles, California
Rail and transit, Transportation
Run-through rail tracks, a wider passenger concourse, platform improvements, and pedestrian upgrades at Los Angeles Union Station.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-10
Project IntelligencePROJECT
Roseville, California
Advanced manufacturing, Semiconductor manufacturing
Bosch is converting its existing Roseville semiconductor facility for silicon carbide production, adding modern cleanroom space and a manufacturing line for automotive and industrial power electronics.
- Owner / developer
- Robert Bosch Semiconductor LLC
- Reported project value
- Up to $2B
- Project stage
- Under construction
Source checked: 2026-10-09
Project IntelligencePROJECT
East Los Angeles to Montebello and Whittier, California
Rail and transit, Transportation
Extension of Metro's E Line toward Whittier. The initial 4.7-mile segment to Montebello is advancing through federal environmental review; the full corridor is approximately nine miles.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Permitting
Source checked: 2026-10-04
Project IntelligencePROJECT
Los Angeles, California
Transportation
Dedicated bus lanes and upgraded stations along 12.4 miles of Vermont Avenue, from Sunset Boulevard to 120th Street. Metro reports final design in progress and targets service for the…
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-04
Project IntelligencePROJECT
San Jose, California
Water and wastewater
Rehabilitation and process changes to secondary treatment aeration basins, including infrastructure for nitrogen removal to meet tighter nutrient discharge limits.
- Owner / developer
- City of San Jose / San Jose-Santa Clara Regional Wastewater Facility
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-04
Project IntelligencePROJECT
San Francisco, California
Healthcare infrastructure
New 15-story hospital at Parnassus Heights. UCSF's April 2026 construction update targets building completion in 2029, followed by activation and patient care in 2030.
- Owner / developer
- University of California San Francisco / UCSF Health
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-04
Project IntelligencePROJECT
Sacramento, California
Airports, Transportation
Phased program including terminal and concourse expansion, parking, a ground transportation center and consolidated rental car facilities.
- Owner / developer
- Sacramento County Department of Airports
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-03
Project IntelligencePROJECT
Tuolumne County, California
Water and wastewater
Rehabilitation of the Mountain Tunnel to maintain reliable drinking-water delivery from the Sierra region to Bay Area customers.
- Owner / developer
- San Francisco Public Utilities Commission
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-03
Project IntelligencePROJECT
Tuolumne County, California
Water and wastewater
Proposed South Fork siphon extension improvements supporting the regional water conveyance system; separate scope from the ongoing Mountain Tunnel rehabilitation.
- Owner / developer
- San Francisco Public Utilities Commission
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-03
Project IntelligencePROJECT
Sacramento, California
Healthcare infrastructure
New hospital tower and pavilion adding clinical capacity, seismic compliance and operating improvements to UC Davis Medical Center.
- Owner / developer
- UC Davis Health
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-03
Project IntelligencePROJECT
Los Gatos, California
Water and wastewater
Upgrades aging treatment equipment and adds facilities to improve reliability and increase production capacity from 80 to 100 million gallons per day.
- Owner / developer
- Valley Water
- Reported project value
- Not verified
Source checked: 2026-10-02
Project IntelligencePROJECT
Los Angeles, California
Water and wastewater
Collaborative water purification and reuse program strengthens local supply resilience through advanced treatment and planned conveyance infrastructure.
- Owner / developer
- LADWP / Los Angeles Sanitation and Environment
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-02
Project IntelligencePROJECT
Morgan Hill–San Jose, California
Water and wastewater
Adds a 7,100-foot pipeline section capable of supplying up to 22,000 gallons per minute to Coyote Creek to support habitat and groundwater recharge.
- Owner / developer
- Valley Water
- Reported project value
- Not verified
- Project stage
- Operational
Source checked: 2026-10-02
Project IntelligencePROJECT
Los Angeles, California
Expanded rail infrastructure at Pier 400 improves intermodal cargo movement, supports on-dock train handling and reduces truck-related impacts.
- Owner / developer
- Port of Los Angeles
- Reported project value
- $73M
- Project stage
- Operational
Source checked: 2026-10-02
Project IntelligencePROJECT
San Fernando Valley, California
Metro is delivering the southern 6.7-mile segment along Van Nuys Boulevard, with 11 stations. The full corridor concept extends farther north; this record tracks the first construction segment.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
Southeast Los Angeles County, California
The planned light rail corridor will connect Southeast Los Angeles County communities with the Metro network. Metro's June 2026 fact sheet identifies a 2035 completion forecast; early work and…
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-01
Project IntelligencePROJECT
San Diego, California
The next phase of Terminal 1 redevelopment adds further gates and passenger facilities after the first phase opened. The airport identifies 2028 as the Phase 1B completion target.
- Owner / developer
- San Diego County Regional Airport Authority
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
North Hollywood, Burbank, Glendale, Eagle Rock and Pasadena, California
Transportation
A 19-mile BRT corridor with 22 enhanced stations, dedicated lanes and zero-emission electric buses.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
San Fernando Valley to West Los Angeles, California
Transportation
Metro is developing an underground heavy rail connection between Van Nuys Metrolink and the E Line at Expo/Sepulveda.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-01
Project IntelligencePROJECT
Los Angeles County, California
Transportation, Highways and bridges
The corridor project adds ExpressLanes and associated pavement, drainage and retaining-wall improvements between Sepulveda Boulevard and I-605.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority; Caltrans
- Reported project value
- Not verified
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
Southeastern Santa Clara County, California
Water and wastewater
The proposed expansion would increase operational reservoir storage from 5,500 to as much as 140,000 acre-feet to improve drought resilience and emergency supply.
- Owner / developer
- Valley Water; San Benito County Water District; Pacheco Pass Water District
- Reported project value
- Not verified
- Project stage
- Planning
Source checked: 2026-10-01
Project IntelligencePROJECT
San Luis Reservoir near Los Banos, California
Water and wastewater
The dam safety program strengthens B.F. Sisk Dam with stability berms and a crest raise to reduce earthquake-related overtopping risk.
- Owner / developer
- U.S. Bureau of Reclamation; California Department of Water Resources
- Reported project value
- $1.1B
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
Wilmington, Los Angeles, California
Transportation, Highways and bridges
A bridge over active railroad operations and 12 acres of public space will connect Wilmington residents to the waterfront promenade.
- Owner / developer
- Port of Los Angeles
- Reported project value
- $152M
- Project stage
- Under construction
Source checked: 2026-10-01
Project IntelligencePROJECT
Redondo Beach to Torrance, California
Transportation
Metro plans a 4.5-mile extension with two stations linking Redondo Beach’s Marine Station to the Torrance Transit Center.
- Owner / developer
- Los Angeles County Metropolitan Transportation Authority
- Reported project value
- Not verified
- Project stage
- Design
Source checked: 2026-10-01