Transportation, Highways and bridges
State Route 91 Eastbound Corridor Operations Project
SR 91 between SR 241 and SR 71, CA
Project overview
FY 2026 BUILD award scope: This project will implement an operational lane for approximately three miles in the eastbound direction on State Route 91 from the State Route 241 general purpose connector to the State Route 71 connector auxiliary lane.
- Scope
- This project will implement an operational lane for approximately three miles in the eastbound direction on State Route 91 from the State Route 241 general purpose connector to the State Route 71 connector auxiliary lane. Other improvements include widening bridges, construct retaining walls, construct a two-lane exit ramp, replace overhead signs, lowering Coal Canyon access road, and construct debris and rockfall mitigation measures.
- Project type
- Road — capital award scope
- Reported investment / scope
- $177,787,960 — USDOT total project cost at FY 2026 award; applies to the described award scope.
- Funding sources
- $25,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Riverside County Transportation Commission
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2026 BUILD award scope: This project will implement an operational lane for approximately three miles in the eastbound direction on State Route 91 from the State Route 241 general purpose connector to the State Route 71 connector auxiliary lane.
Funded scope
This project will implement an operational lane for approximately three miles in the eastbound direction on State Route 91 from the State Route 241 general purpose connector to the State Route 71 connector auxiliary lane. Other improvements include widening bridges, construct retaining walls, construct a two-lane exit ramp, replace overhead signs, lowering Coal Canyon access road, and construct debris and rockfall mitigation measures.
Funding at award
$177,787,960 — USDOT total project cost at FY 2026 award; applies to the described award scope.
$25,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in