| U.S. Highway 17 Pedestrian Crossing — BL-0074, LelandAt-grade pedestrian crossing and approximately 300 feet of sidewalk connecting the Waterford network. | U.S. 17 at Ploof Road/Olde Waterford Way, Leland, North Carolina, United States | Highways and bridges, Transportation | Not verified | Procurement | Town of Leland | Not verified | 2026-10-19 |
| Sound Transit Operations and Maintenance Facility SouthA new light rail operations and maintenance facility will store, clean and repair trains supporting future regional… | South King County, Washington | Rail and transit, Transportation | Not verified | Procurement | Sound Transit | Not verified | 2026-10-09 |
| NASA Glenn Aerospace Power Systems LaboratoryPlanned laboratory at NASA Glenn Research Center in Cleveland for testing and developing aerospace power systems, including… | Cleveland, OH | Space infrastructure | Not verified | Procurement | NASA Glenn Research Center | RFP openDeadline 2026-10-30 | 2026-10-08 |
| Cape Cod Bridges Replacement ProgramReplacement program for the aging Sagamore and Bourne canal crossings, including roadway connections and multimodal improvements; Sagamore… | Bourne, Massachusetts | Highways and bridges, Transportation | Not verified | Procurement | MassDOT / U.S. Army Corps of Engineers | Not verified | 2026-10-03 |
| Town Lake Park SidewalkA sidewalk construction project at Town Lake Park delivered in coordination with North Carolina Department of Transportation… | Pittsboro, North Carolina | Transportation | Not verified | Procurement | Town of Pittsboro | Deadline passed | 2026-10-02 |
| US 150/127 Industrial Road EntranceConstruction of an industrial road entrance on the US 150/127 Bypass with turn lanes and related drainage… | Danville, Kentucky | Highways and bridges, Transportation | Not verified | Procurement | City of Danville | Deadline passed | 2026-10-02 |
| 183A Southbound Frontage Road at Scottsdale DriveRoadway widening and intersection work on the 183A southbound frontage road at Scottsdale Drive to create a… | Cedar Park, Texas | Highways and bridges, Transportation | Not verified | Procurement | City of Cedar Park | Deadline passed | 2026-10-02 |
| Rawson Pond Dam Spillway ReplacementA public-works project to replace the spillway at Rawson Pond dam. | Cumberland, Rhode Island | Resilience and flood protection | Not verified | Procurement | Town of Cumberland | Deadline passed | 2026-10-02 |
| North Van Dyke Corridor Improvements and Stormwater Resilience PlanA planning program for North Van Dyke Avenue corridor improvements integrated with stormwater resilience measures. | Sterling Heights, Michigan | Resilience and flood protection | Not verified | Procurement | City of Sterling Heights | Deadline passed | 2026-10-02 |
| Bower Lane Sidewalk Improvement ProjectA pedestrian and drainage improvement project along Bower Lane and Blythe Avenue funded through the Community Development… | Cleveland, Tennessee | Transportation | Not verified | Procurement | City of Cleveland | Deadline passed | 2026-10-02 |
| Collier Drive Forcemain ImprovementsA new 6-inch sewer force main along the Collier Drive project area, including a substantial horizontal directional… | Sevierville, Tennessee | Water and wastewater | Not verified | Procurement | City of Sevierville | Deadline passed | 2026-10-02 |
| 258 North Main Street Storm Sewer ImprovementsInstallation of a new storm collector and related structures along North Main Street, with connection to the… | Hudson, Ohio | Water and wastewater | Not verified | Procurement | City of Hudson | Deadline passed | 2026-10-02 |
| Bismarck City County Building Renovation and AdditionA comprehensive renovation of the existing City County Building with a south addition, new public entrance, lobby,… | Bismarck, North Dakota | Public buildings | Not verified | Procurement | City of Bismarck | Deadline passed | 2026-10-02 |
| 2026 Morgan Hill Water Main Replacement ProjectTargeted replacement and abandonment of existing water-main segments near the Oak Canyon Tank access road and Circle… | Morgan Hill, California | Water and wastewater | $450,000 | Procurement | City of Morgan Hill | Deadline passed | 2026-10-02 |
| New U.S. Courthouse in HartfordGSA is procuring a design-build team for a new federal courthouse of up to 281,000 gross square… | 154 Allyn Street, Hartford, Connecticut | Public buildings | $344.97M | Procurement | U.S. General Services Administration, Public Buildings Service | Not verified | 2026-10-01 |
| Amtrak State-Supported Fleet Modernization ProgramAmtrak received a $2.05 billion federal grant for acquisition of up to 43 new trainsets and associated… | Multiple U.S. state-supported rail corridors | Rail and transit, Transportation | Not verified | Procurement | Amtrak | Not verified | 2026-10-01 |
| LIRR West Hempstead and Winfield Substation ReplacementsContract 6541 will deliver a new West Hempstead substation headquarters and replacement traction-power substations at West Hempstead… | West Hempstead, Nassau County and Winfield/Woodside, Queens, New York | Transmission and distribution, Rail and transit, Transportation | Not verified | Procurement | Metropolitan Transportation Authority / Long Island Rail Road | RFP openDeadline 2026-11-17 | 2026-09-30 |
| I-69 Ohio River Crossing — Section 2The main Ohio River crossing package for I-69, including a new four-lane bridge and connecting roadways. This… | Evansville, Indiana / Henderson, Kentucky — approximate regional pin | Transportation | Not verified | Procurement | Indiana Department of Transportation / Kentucky Transportation Cabinet | Not verified | 2026-09-30 |
| Interstate Bridge Replacement ProgramReplacement of the I-5 Columbia River crossing with earthquake-resistant bridges, connecting highway work, light rail and active… | Portland, Oregon / Vancouver, Washington — approximate regional pin | Highways and bridges, Transportation | Not verified | Procurement | Oregon Department of Transportation and Washington State Department of Transportation | Not verified | 2026-09-29 |