Transportation, Highways and bridges
Wind River Canyon Corridor Resilience and Feasibility Study
Wind River Canyon, WY
Project overview
FY 2024 RAISE award scope: This project will develop a resilience and feasibility study to guide resilience planning decisions for the Wind River Canyon Corridor along US Highway 20/State Highway 789.
- Scope
- This project will develop a resilience and feasibility study to guide resilience planning decisions for the Wind River Canyon Corridor along US Highway 20/State Highway 789. The study will address various closure and travel delay risks frequently affecting the corridor—from rock falls and landslides, to inclement weather and crashes. The study will provide recommendations to improve the corridor's resiliency and examine the feasibility of establishing a new alternative route to US WY 20/789.
- Project type
- Road — planning/design award scope
- Reported investment / scope
- $1,800,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
- Funding sources
- $1,620,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Wyoming Department of Transportation Directory profile ↗
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2024 RAISE award scope: This project will develop a resilience and feasibility study to guide resilience planning decisions for the Wind River Canyon Corridor along US Highway 20/State Highway 789.
Funded scope
This project will develop a resilience and feasibility study to guide resilience planning decisions for the Wind River Canyon Corridor along US Highway 20/State Highway 789. The study will address various closure and travel delay risks frequently affecting the corridor—from rock falls and landslides, to inclement weather and crashes. The study will provide recommendations to improve the corridor's resiliency and examine the feasibility of establishing a new alternative route to US WY 20/789.
Funding at award
$1,800,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
$1,620,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in