Space infrastructure
Vandenberg Consolidated Air Traffic Control Tower and Fire Station
Vandenberg Space Force Base, California
Project overview
A consolidated replacement facility at Vandenberg Space Force Base will combine air traffic control, airfield fire response and airfield operations functions supporting the installation’s 15,000-foot runway and spaceport logistics.
- Scope
- Replace critical airfield infrastructure with a consolidated air traffic control tower, fire station and airfield operations facility.
- Project type
- Air traffic control, fire response and airfield operations facility
- Reported investment / scope
- Not available
- Funding sources
- Not available
- Delivery method
- Design-bid-build
Organizations involved
- Owner / developer
- U.S. Space Force
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- U.S. Space Force; U.S. Army Corps of Engineers Los Angeles District; U.S. Army Engineering and Support Center, Huntsville
Business opportunities
Upcoming RFP
- Current procurement record
- Not available
- Upcoming procurement
- Construction advertisement is anticipated in fiscal 2028, subject to completion of final design and authorization.
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Full design task order option planned in 2026; construction solicitation anticipated in fiscal 2028
- Construction start
- 35% design reviewed in 2026
- Estimated completion
- Not available
- Dated milestones
- 2025-08 — Architect-engineer design task order awarded.
2026-03 — Stakeholders reviewed the 35% design package.
FY2028 — Construction advertisement anticipated. - Permitting
- Not available
- Recent project updates
- 2026-06-17 — USACE reported that the project was advancing from 35% design toward a certified final design.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
Sector: Space Infrastructure
Stage: Design
A consolidated replacement facility at Vandenberg Space Force Base will combine air traffic control, airfield fire response and airfield operations functions supporting the installation’s 15,000-foot runway and spaceport logistics.
Latest verified milestone
USACE reported on June 17 that the 35% design had been reviewed and that the project team was preparing the option needed to advance the design to a certified final package.
View the official project source
Project record reviewed October 1, 2026. Dates and status reflect the cited public source and may change.
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in