Utah Trail Network Four Corners Planning Study
Southeast Utah / Navajo Nation, UT
Project overview
FY 2024 RAISE award scope: This project will conduct the planning activities for the construction of a separated, paved, shared-use trail along US-191, US-163, and SR-162 in southeast Utah and in the Navajo Nation.
- Scope
- This project will conduct the planning activities for the construction of a separated, paved, shared-use trail along US-191, US-163, and SR-162 in southeast Utah and in the Navajo Nation. The project will perform approximately 160-miles of feasibility study on the entire corridor, and approximately 61-miles of design work on the highest priority segments. The feasibility study will focus on public outreach, alignment with upcoming UDOT projects, right-of-way investigation, identification of environmental concerns, cost estimates, and prioritization. The design work will identify exact trail alignments, perform survey work for exact cut/fill quantities, and deliver a complete design package.
- Project type
- Bicycle-Pedestrian — planning/design award scope
- Reported investment / scope
- $12,000,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
- Funding sources
- $9,600,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Utah Department of Transportation Directory profile ↗
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2024 RAISE award scope: This project will conduct the planning activities for the construction of a separated, paved, shared-use trail along US-191, US-163, and SR-162 in southeast Utah and in the Navajo Nation.
Funded scope
This project will conduct the planning activities for the construction of a separated, paved, shared-use trail along US-191, US-163, and SR-162 in southeast Utah and in the Navajo Nation. The project will perform approximately 160-miles of feasibility study on the entire corridor, and approximately 61-miles of design work on the highest priority segments. The feasibility study will focus on public outreach, alignment with upcoming UDOT projects, right-of-way investigation, identification of environmental concerns, cost estimates, and prioritization. The design work will identify exact trail alignments, perform survey work for exact cut/fill quantities, and deliver a complete design package.
Funding at award
$12,000,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
$9,600,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in