US 395 – NSC Spokane River Crossing
Spokane County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Construct the North Spokane Corridor bridge over the Spokane River to connect the elevated highway sections on either bank.
Technical scope
Construct the North Spokane Corridor bridge over the Spokane River to connect the elevated highway sections on either bank.
Agency-published project contact: Alex Proszek | Project Engineer | 509-323-8411 | alex.proszek@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-395-nsc-spokane-river-crossing
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Alex Proszek | Project Engineer | 509-323-8411 | alex.proszek@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded contractor
- Max J. Kuney Company (agency-reported award: February 2023)
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $91 Million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Project PIN 600015J; Connecting Washington - $91,063,000 Total - $91,063,000
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: May 2023 - Winter 2026. Agency stage: Construction.
Agency milestone schedule (reviewed 2026-11-06):
December 2022: Project is on ad.
February 2023: Project awarded to Max J. Kuney Company.
May 2023: Project breaks ground.
June 2023: Formal groundbreaking on the project took place Tuesday, June 13.
October 2024: Bridge girders begin to be set across the Spokane River.
May 2025: Post tensioning of hammerhead girders completed.
June 2025: Steel truss pedestrian bridge lifted and set into place.
July 2025: Concrete deck pour underway.
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: May 2023 - Winter 2026. Agency stage: Construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, contractor, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.