US 395 – Division Wye to Wandermere – Paving – Complete Streets
Spokane County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Design-bid-build (agency project page)
- Expected completion
- Not verified
Overview
Rehabilitate US 395 between the US 2 Wye and Wandermere Road, with Complete Streets features included in the project.
Technical scope
Rehabilitate US 395 between the US 2 Wye and Wandermere Road, with Complete Streets features included in the project.
Agency-published project contact: Tracey Partridge | Engineering Manager for Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-395-division-wye-wandermere-paving-complete-streets
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Tracey Partridge | Engineering Manager for Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $10 million to $13.5 million estimated project cost
- Recorded funding
- Agency funding detail (2026-11-06): The project will use Pre-Existing Funds (PEF). The project is estimated to cost between $10-$13.5 Million.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: Spring 2023 - Fall 2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
March 2023: Pre-design phase initiated.
May 9, 2024: Whitworth University Students and Staff online survey went live
May 28, 2024: Fairwood Farmers Market Booth
May 29, 2024: Community wide online survey is live
May 30, 2024: Distributed fliers to businesses advertising community workshop
June 4, 2024: Listening Post at Rosauers Supermarket
June 6, 2024: Listening post held at Rockwood Retirement at Whitworth
June 11, 2024: Community Workshop was held at Whitworth University to introduce the project and get their needs and preferences for active transportation.
June 18, 2024: Fairwood Farmer Market Booth
June 24, 2024: Online survey closed
November 14, 2024: Microsoft Teams hosted updated and Q&A session
April 2, 2025: Complete Streets Open House
April 2026: Complete Streets Report and Deferral Design Decision finalized
May 2026: Basis of Design (BOD) finalized and Pre-Design completed
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2023 - Fall 2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, delivery, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.