US 395 – Division Wye to Wandermere – Paving – Complete Streets

Spokane County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$10 million to $13.5 million estimated project cost
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Design-bid-build (agency project page)
Expected completion
Not verified

Overview

Rehabilitate US 395 between the US 2 Wye and Wandermere Road, with Complete Streets features included in the project.

Technical scope

Rehabilitate US 395 between the US 2 Wye and Wandermere Road, with Complete Streets features included in the project.

Agency-published project contact: Tracey Partridge | Engineering Manager for Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-395-division-wye-wandermere-paving-complete-streets

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Tracey Partridge | Engineering Manager for Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$10 million to $13.5 million estimated project cost
Recorded funding
Agency funding detail (2026-11-06): The project will use Pre-Existing Funds (PEF). The project is estimated to cost between $10-$13.5 Million.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: Spring 2023 - Fall 2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
March 2023: Pre-design phase initiated.
May 9, 2024: Whitworth University Students and Staff online survey went live
May 28, 2024: Fairwood Farmers Market Booth
May 29, 2024: Community wide online survey is live
May 30, 2024: Distributed fliers to businesses advertising community workshop
June 4, 2024: Listening Post at Rosauers Supermarket
June 6, 2024: Listening post held at Rockwood Retirement at Whitworth
June 11, 2024: Community Workshop was held at Whitworth University to introduce the project and get their needs and preferences for active transportation.
June 18, 2024: Fairwood Farmer Market Booth
June 24, 2024: Online survey closed
November 14, 2024: Microsoft Teams hosted updated and Q&A session
April 2, 2025: Complete Streets Open House
April 2026: Complete Streets Report and Deferral Design Decision finalized
May 2026: Basis of Design (BOD) finalized and Pre-Design completed

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2023 - Fall 2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, delivery, funding, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.