US 2/Corridor Safety Improvements
Snohomish County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Fall 2027: Construction scheduled for completion.
Overview
Improve eleven US 2 locations between Monroe and Gold Bar, including a Sultan roundabout and upgrades to crossings, ramps, markings and signs.
Technical scope
Improve eleven US 2 locations between Monroe and Gold Bar, including a Sultan roundabout and upgrades to crossings, ramps, markings and signs.
Agency-published project contact: Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-2-corridor-safety-improvements
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $16.65 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $16.65 million from the Connecting Washington Account.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Fall 2026: Construction scheduled to begin.
- Recorded completion
- Fall 2027: Construction scheduled for completion.
- Recorded milestones
- Agency-listed project timeline: 2024 – April 2027. Agency stage: Construction.
Agency milestone schedule (reviewed 2026-11-06):
2024: Design
Summer 2026: Project advertised for competitive bidding.
Fall 2026: Construction scheduled to begin.
Fall 2027: Construction scheduled for completion.
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2024 – April 2027. Agency stage: Construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, completion, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.