US 2/Corridor Safety Improvements

Snohomish County, Washington · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startFall 2026: Construction scheduled to begin.
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Fall 2027: Construction scheduled for completion.

Overview

Improve eleven US 2 locations between Monroe and Gold Bar, including a Sultan roundabout and upgrades to crossings, ramps, markings and signs.

Technical scope

Improve eleven US 2 locations between Monroe and Gold Bar, including a Sultan roundabout and upgrades to crossings, ramps, markings and signs.

Agency-published project contact: Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-2-corridor-safety-improvements

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $16.65 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $16.65 million from the Connecting Washington Account.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Fall 2026: Construction scheduled to begin.
Recorded completion
Fall 2027: Construction scheduled for completion.
Recorded milestones
Agency-listed project timeline: 2024 – April 2027. Agency stage: Construction.
Agency milestone schedule (reviewed 2026-11-06):
2024: Design
Summer 2026: Project advertised for competitive bidding.
Fall 2026: Construction scheduled to begin.
Fall 2027: Construction scheduled for completion.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2024 – April 2027. Agency stage: Construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, completion, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.