US 195 – Colfax North Fork Palouse River – Replace Bridges

Whitman County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Replace two aging US 195 bridges over the North Fork Palouse River in Colfax with one new structure.

Technical scope

Replace two aging US 195 bridges over the North Fork Palouse River in Colfax with one new structure.

Agency-published project contact: Haitham Hesham | Project Engineer | 509-324-6251 | haitham.hesham@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-195-colfax-north-fork-palouse-river-replace-bridges

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Haitham Hesham | Project Engineer | 509-324-6251 | haitham.hesham@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $13 Million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Project PIN 619503P; Pre-Existing Funds (PEF) - $13,273,000 Total - $13,273,000

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: Summer 2029 - Summer 2031. Agency stage: Not started.
Agency milestone schedule (reviewed 2026-11-06):
December 2022: First community engagement event was held in Colfax.
March 2023: Second community engagement event was held in Colfax.
October 2023: Pre-design phase completed.
January 2024: Design funding allocated, full design efforts underway.
January 2024: Third public engagement event was held in Colfax.
February 2024: After extensive engagement in Colfax and several surveys, the roundabout intersection was chosen as the final option.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Summer 2029 - Summer 2031. Agency stage: Not started. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.