- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Replace two aging US 195 bridges over the North Fork Palouse River in Colfax with one new structure.
Technical scope
Replace two aging US 195 bridges over the North Fork Palouse River in Colfax with one new structure.
Agency-published project contact: Haitham Hesham | Project Engineer | 509-324-6251 | haitham.hesham@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-195-colfax-north-fork-palouse-river-replace-bridges
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Haitham Hesham | Project Engineer | 509-324-6251 | haitham.hesham@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $13 Million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Project PIN 619503P; Pre-Existing Funds (PEF) - $13,273,000 Total - $13,273,000
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: Summer 2029 - Summer 2031. Agency stage: Not started.
Agency milestone schedule (reviewed 2026-11-06):
December 2022: First community engagement event was held in Colfax.
March 2023: Second community engagement event was held in Colfax.
October 2023: Pre-design phase completed.
January 2024: Design funding allocated, full design efforts underway.
January 2024: Third public engagement event was held in Colfax.
February 2024: After extensive engagement in Colfax and several surveys, the roundabout intersection was chosen as the final option.
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Summer 2029 - Summer 2031. Agency stage: Not started. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.