US 12 – Wishkah River Bridge – Mechanical Rehabilitation
Grays Harbor County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Late summer/early fall 2028: Expected completion of construction
Overview
Replace worn mechanical components of the US 12 Wishkah River movable bridge to preserve reliable operation.
Technical scope
Replace worn mechanical components of the US 12 Wishkah River movable bridge to preserve reliable operation.
Agency-published project contact: Bonnie Kramer | Project Engineer | 360-538-8502 | Bonnie.Kramer@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-12-wishkah-river-bridge-mechanical-rehabilitation
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Bonnie Kramer | Project Engineer | 360-538-8502 | Bonnie.Kramer@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Previously recorded anticipated work
Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. February 2027: Expected construction contract advertised for competitive bids
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: The current budget for this project is approximately $12 million. This figure is not assumed to be a total project cost.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Early fall 2027: Expected start of construction
- Recorded completion
- Late summer/early fall 2028: Expected completion of construction
- Recorded milestones
- Agency-listed project timeline: 2027-2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
February 2027: Expected construction contract advertised for competitive bids
Early fall 2027: Expected start of construction
Late summer/early fall 2028: Expected completion of construction
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2027-2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, start, completion, upcoming bids, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.