← Infraday Projects

INFRADAY PROJECTS

US 12 – Wishkah River Bridge – Mechanical Rehabilitation

Grays Harbor County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startEarly fall 2027: Expected start of construction
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Late summer/early fall 2028: Expected completion of construction

Overview

Replace worn mechanical components of the US 12 Wishkah River movable bridge to preserve reliable operation.

Technical scope

Replace worn mechanical components of the US 12 Wishkah River movable bridge to preserve reliable operation.

Agency-published project contact: Bonnie Kramer | Project Engineer | 360-538-8502 | Bonnie.Kramer@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-12-wishkah-river-bridge-mechanical-rehabilitation

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Bonnie Kramer | Project Engineer | 360-538-8502 | Bonnie.Kramer@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Previously recorded anticipated work

Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. February 2027: Expected construction contract advertised for competitive bids

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: The current budget for this project is approximately $12 million. This figure is not assumed to be a total project cost.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Early fall 2027: Expected start of construction
Recorded completion
Late summer/early fall 2028: Expected completion of construction
Recorded milestones
Agency-listed project timeline: 2027-2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
February 2027: Expected construction contract advertised for competitive bids
Early fall 2027: Expected start of construction
Late summer/early fall 2028: Expected completion of construction

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2027-2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, start, completion, upcoming bids, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.