US 101 E of May Creek – Emergency Repair

Jefferson County, Washington · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Stabilize the slope beside southbound US 101 near Dowans Creek Road and repair the affected roadway.

Technical scope

Stabilize the slope beside southbound US 101 near Dowans Creek Road and repair the affected roadway.

Agency-published project contact: Melissa Mies | Project Engineer | 360-565-0620 | Melissa.Mies@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-101-e-may-creek-emergency-repair

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Melissa Mies | Project Engineer | 360-565-0620 | Melissa.Mies@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Recorded package values
$1.77 million awarded emergency contract

Companies Involved

Recorded contractor
Active Construction, Inc. (emergency contract)

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
$1.77 million emergency contract awarded to Active Construction, Inc.; total project cost not established.
Agency funding detail (2026-11-06): Awarded emergency contract: $1.77 million to Active Construction, Inc. This is a contract value, not a verified total project cost.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Construction.
Agency milestone schedule (reviewed 2026-11-06):
February 16, 2026: Phase one of the emergency work begins
February 19, 2026: Nighttime full closures of US 101 begin
March 8, 2026: Nighttime full closures complete, contractor shifts to daytime work
March 18, 2026: First phase of work complete

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, contractor, package value, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.