US 101 E of May Creek – Emergency Repair
Jefferson County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Stabilize the slope beside southbound US 101 near Dowans Creek Road and repair the affected roadway.
Technical scope
Stabilize the slope beside southbound US 101 near Dowans Creek Road and repair the affected roadway.
Agency-published project contact: Melissa Mies | Project Engineer | 360-565-0620 | Melissa.Mies@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/us-101-e-may-creek-emergency-repair
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Melissa Mies | Project Engineer | 360-565-0620 | Melissa.Mies@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
- Recorded package values
- $1.77 million awarded emergency contract
Companies Involved
- Recorded contractor
- Active Construction, Inc. (emergency contract)
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- $1.77 million emergency contract awarded to Active Construction, Inc.; total project cost not established.
Agency funding detail (2026-11-06): Awarded emergency contract: $1.77 million to Active Construction, Inc. This is a contract value, not a verified total project cost.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Construction.
Agency milestone schedule (reviewed 2026-11-06):
February 16, 2026: Phase one of the emergency work begins
February 19, 2026: Nighttime full closures of US 101 begin
March 8, 2026: Nighttime full closures complete, contractor shifts to daytime work
March 18, 2026: First phase of work complete
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, contractor, package value, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.