Ports and maritime, Transportation
The Port of Nevada – A Sustainable Intermodal Development
Western Nevada Transload / Port of Nevada, NV
Project overview
FY 2024 RAISE award scope: This project will develop a master plan and complete preliminary design and NEPA to support the approximately 658 acre expansion of the existing 74 acre Western Nevada Transload.
- Scope
- This project will develop a master plan and complete preliminary design and NEPA to support the approximately 658 acre expansion of the existing 74 acre Western Nevada Transload. The expansion will include approximately 2.8 million square feet of industrial building space, approximately 80 acres of container storage yards, approximately 20,000 lineal feet of new rail, and an approximate 10-acre commercial district to support the on-site workforce.
- Project type
- Rail — planning/design award scope
- Reported investment / scope
- $12,211,184 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
- Funding sources
- $6,105,592 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Northern Nevada Development Authority
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2024 RAISE award scope: This project will develop a master plan and complete preliminary design and NEPA to support the approximately 658 acre expansion of the existing 74 acre Western Nevada Transload.
Funded scope
This project will develop a master plan and complete preliminary design and NEPA to support the approximately 658 acre expansion of the existing 74 acre Western Nevada Transload. The expansion will include approximately 2.8 million square feet of industrial building space, approximately 80 acres of container storage yards, approximately 20,000 lineal feet of new rail, and an approximate 10-acre commercial district to support the on-site workforce.
Funding at award
$12,211,184 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
$6,105,592 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in