infraday

Connecting infrastructure leaders since 2017.

THE BUSINESS OF
INFRASTRUCTURE
← Project Atlas

Renewable energy

Tehuacana Creek Solar

Navarro County, Texas

Estimated valueNot verified
StageUnder construction
Owner / developerParliament Energy Holdings LLC
Last verified2026-10-25

Project overview

EIA's September 2026 inventory lists Tehuacana Creek Solar in Navarro County, Texas, with 418 MW of battery storage power capacity; 644.8 MW of solar photovoltaic generation. The reporting entity is Parliament Energy Holdings LLC.

Scope
EIA plant ID 65855; 2 planned generator/storage unit records, grouped as one project. Reported nameplate capacity: 418 MW of battery storage power capacity; 644.8 MW of solar photovoltaic generation. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (V) Under construction, more than 50 percent complete: generator IDs TE1BS, TE1PV.
Project type
Solar photovoltaic and battery storage
Reported investment / scope
Not available
Funding sources
Not available
Delivery method
Not available

Organizations involved

Owner / developer
Parliament Energy Holdings LLC
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
EIA reporting entity: Parliament Energy Holdings LLC

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

Check official project / procurement portal ↗

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
December 2026–May 2027 across the listed units (reported planned operation; September 2026 inventory; subject to change)
Dated milestones
Not available
Permitting
Not available
Recent project updates
2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (V) Under construction, more than 50 percent complete. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

EIA's September 2026 inventory lists Tehuacana Creek Solar in Navarro County, Texas, with 418 MW of battery storage power capacity; 644.8 MW of solar photovoltaic generation. The reporting entity is Parliament Energy Holdings LLC.

Project scope

EIA plant ID 65855; 2 planned generator/storage unit records, grouped as one project. Reported nameplate capacity: 418 MW of battery storage power capacity; 644.8 MW of solar photovoltaic generation. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (V) Under construction, more than 50 percent complete: generator IDs TE1BS, TE1PV.

Sponsor and location

Reported organization: Parliament Energy Holdings LLC

Location: Navarro County, Texas

Status and schedule

2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (V) Under construction, more than 50 percent complete. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.

Reported operating target: December 2026–May 2027 across the listed units (reported planned operation; September 2026 inventory; subject to change)

Source verification

EIA Form 860M, September 2026 preliminary inventory, Planned worksheet, plant ID 65855, Excel rows 356, 784. Published October 23, 2026; checked October 25, 2026. Only the units in the Planned worksheet are included.

EIA September 2026 preliminary generator inventory (XLSX)

EIA inventory release and methodology

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.