Power generation
Staccato BESS
Fayette County, Texas
Project overview
EIA's September 2026 inventory lists Staccato BESS in Fayette County, Texas, with 200.5 MW of battery storage power capacity. The reporting entity is Sunraycer Assets I LLC.
- Scope
- EIA plant ID 70021; 1 planned generator/storage unit record, grouped as one project. Reported nameplate capacity: 200.5 MW of battery storage power capacity. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (U) Under construction, less than or equal to 50 percent complete: generator IDs STACB.
- Project type
- Battery energy storage
- Reported investment / scope
- Not available
- Funding sources
- Not available
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Sunraycer Assets I LLC
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- EIA reporting entity: Sunraycer Assets I LLC
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- April 2027 (reported planned operation; September 2026 inventory; subject to change)
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- 2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (U) Under construction, less than or equal to 50 percent complete. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
EIA's September 2026 inventory lists Staccato BESS in Fayette County, Texas, with 200.5 MW of battery storage power capacity. The reporting entity is Sunraycer Assets I LLC.
Project scope
EIA plant ID 70021; 1 planned generator/storage unit record, grouped as one project. Reported nameplate capacity: 200.5 MW of battery storage power capacity. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (U) Under construction, less than or equal to 50 percent complete: generator IDs STACB.
Sponsor and location
Reported organization: Sunraycer Assets I LLC
Location: Fayette County, Texas
Status and schedule
2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (U) Under construction, less than or equal to 50 percent complete. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.
Reported operating target: April 2027 (reported planned operation; September 2026 inventory; subject to change)
Source verification
EIA Form 860M, September 2026 preliminary inventory, Planned worksheet, plant ID 70021, Excel rows 755. Published October 23, 2026; checked October 25, 2026. Only the units in the Planned worksheet are included.
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in