SR 9 – 176th Street SE to SR 96 – Widening
Snohomish County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Add a second northbound lane and safety improvements on SR 9 between 176th Street Southeast and SR 96 to close a capacity gap.
Technical scope
Add a second northbound lane and safety improvements on SR 9 between 176th Street Southeast and SR 96 to close a capacity gap.
Agency-published project contact: Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-9-176th-street-se-sr-96-widening
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- Design and right-of-way are funded; the agency states construction is not currently funded. The page lists $22.1 million.
Agency funding detail (2026-11-06): Design and right-of-way acquisition are funded. Construction of the full widening project is not funded.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: 2025 - 2027. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
January 2017: Community open house
April 2017: Flashing yellow left turn arrows added at two intersections
2018: Second northbound lane added on SR 9 from 136th Street to SR 96
2023: Attended Town Hall meeting and held a detailed information session with Clearview Community Association
January 2026: Project scheduled to be advertised (pending funding)
Spring 2026: Contractor scheduled to be hired (pending funding)
2026: Construction tentatively scheduled to begin (pending funding)
2028: Construction tentatively scheduled for completion (pending funding)
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2025 - 2027. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.