SR 546 – SR 539 to Fishtrap Creek – Paving With Exceptions
Whatcom County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Fall 2028: Construction scheduled for completion.
Overview
Renew pavement on SR 546 between SR 539 and Vinup Road, excluding recently improved fish-passage locations, and assess accessibility upgrades.
Technical scope
Renew pavement on SR 546 between SR 539 and Vinup Road, excluding recently improved fish-passage locations, and assess accessibility upgrades.
Agency-published project contact: Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-546-sr-539-fishtrap-creek-paving-exceptions
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Previously recorded anticipated work
Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. Early 2028: Advertised for competitive bidding.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $2.9 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $2.89 million from Pre-Existing Funds.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded completion
- Fall 2028: Construction scheduled for completion.
- Recorded milestones
- Agency-listed project timeline: Spring 2026 - Fall 2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Spring 2026 - Spring 2027: Pre-Design phase.
Spring 2027 - Fall 2027: Design phase.
Early 2028: Advertised for competitive bidding.
Fall 2028: Construction scheduled for completion.
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2026 - Fall 2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, completion, upcoming bids, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.