← Infraday Projects

INFRADAY PROJECTS

SR 525 Mukilteo Bridge Over Railroad – Bridge Replacement

Mukilteo, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Replace the SR 525 bridge over the BNSF railway in Mukilteo and improve walking and cycling connections between Old Town and the waterfront.

Technical scope

Replace the SR 525 bridge over the BNSF railway in Mukilteo and improve walking and cycling connections between Old Town and the waterfront.

Agency-published project contact: Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov | Kyengo Ndile, PE | WSDOT Project Engineer | Northwest Region Design Office | 206-440-4292 | Kyengo.Ndile@wsdot.wa.gov | Amber Stanley | Community Engagement | 206-817-8833 | Amber.Stanley@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-525-mukilteo-bridge-over-railroad-bridge-replacement

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov | Kyengo Ndile, PE | WSDOT Project Engineer | Northwest Region Design Office | 206-440-4292 | Kyengo.Ndile@wsdot.wa.gov | Amber Stanley | Community Engagement | 206-817-8833 | Amber.Stanley@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $46.0 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Move Ahead Washington: $46 million

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: 2024 - 2030. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Spring 2024 to Spring 2026: Predesign
Spring 2026 to Spring 2028: Design
Spring 2028 to Winter 2030: Construction

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2024 - 2030. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.