SR 522/Thornton Creek Fish Passage

King County, Washington · Resilience and flood protection

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSummer 2030: Construction scheduled to begin
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Replace the Thornton Creek culvert beneath SR 522 in Seattle and restore the channel to reconnect habitat.

Technical scope

Replace the Thornton Creek culvert beneath SR 522 in Seattle and restore the channel to reconnect habitat.

Agency-published project contact: Eric Zackula | Communications | 206-586-1306 | Eric.Zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-522-thornton-creek-fish-passage

Project type
Fish passage and habitat restoration

Contacts

Recorded professional contact

Eric Zackula | Communications | 206-586-1306 | Eric.Zackula@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Previously recorded anticipated work

Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. Early 2030: Project advertised for contractor bidding

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $36.19 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $36.19 million from Fed-CSRF (ARPA), Connecting Washington (CWA) and MAW & MVA

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Summer 2030: Construction scheduled to begin
Recorded milestones
Agency-listed project timeline: Winter 2021-Summer 2032. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
2021-2030: Design
Early 2030: Project advertised for contractor bidding
Spring 2030: Project awarded to contractor
Summer 2030: Construction scheduled to begin
Summer 2032: Work scheduled for completion

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Winter 2021-Summer 2032. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, upcoming bids, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.