SR 522/Cat Whisker Creek Fish Passage

King County, Washington · Resilience and flood protection

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSummer 2027: Construction scheduled to begin.
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Late 2028: Construction scheduled for completion.

Overview

Replace the Cat Whisker Creek box culvert beneath SR 522 in Kenmore with a fish-passable crossing.

Technical scope

Replace the Cat Whisker Creek box culvert beneath SR 522 in Kenmore with a fish-passable crossing.

Agency-published project contact: Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-522-cat-whisker-creek-fish-passage

Project type
Fish passage and habitat restoration

Contacts

Recorded professional contact

Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Previously recorded anticipated work

Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. Spring 2027: Project advertised for competitive bidding.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $41.9 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $41.9 million from the Connecting Washington Account (CWA), Move Ahead Washington (MAW) and the state Motor Vehicle Account (MVA).

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Summer 2027: Construction scheduled to begin.
Recorded completion
Late 2028: Construction scheduled for completion.
Recorded milestones
Agency-listed project timeline: Spring 2027 - Fall 2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Spring 2027: Project advertised for competitive bidding.
Summer 2027: Contractor selected.
Summer 2027: Construction scheduled to begin.
Late 2028: Construction scheduled for completion.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2027 - Fall 2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, completion, upcoming bids, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.