SR 3 – Freight Corridor – New Alignment
Mason County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Construct a roughly seven-mile limited-access SR 3 bypass of Belfair while retaining the existing highway as a business loop.
Technical scope
Construct a roughly seven-mile limited-access SR 3 bypass of Belfair while retaining the existing highway as a business loop.
Agency-published project contact: Grace Amundsen Barnkow | WSDOT Project Engineer | Grace.AmundsenBarnkow@wsdot.wa.gov | 360-357-2722
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-3-freight-corridor-new-alignment
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Grace Amundsen Barnkow | WSDOT Project Engineer | Grace.AmundsenBarnkow@wsdot.wa.gov | 360-357-2722
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $78 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $78 million is allocated for the project.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: 2028 - 2032. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
January 29 to March 14, 2024: Updated SEA online open house
Feb. 13, 2024: In-person open house for the updated SEA at North Mason High School
Nov. 15, 2024: FHWA issues Finding of No Significant Impact
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2028 - 2032. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.