SR 28 and SR 21 – Town of Odessa – Paving and Complete Streets

Lincoln County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Design-bid-build (agency project page)
Expected completion
Not verified

Overview

Repave SR 21 and SR 28 within Odessa and incorporate Complete Streets features into the corridor design.

Technical scope

Repave SR 21 and SR 28 within Odessa and incorporate Complete Streets features into the corridor design.

Agency-published project contact: Tracey Partridge | Engineering Manager – Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-28-and-sr-21-town-odessa-paving-and-complete-streets

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Tracey Partridge | Engineering Manager – Development | 509-324-6100 | tracey.partridge@wsdot.wa.gov | WSDOT Eastern Region Complete Streets | WSDOT-ER-CS@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $5 Million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Project PIN 600027J; Pre-Existing Funds (PEF) - $5,000,000 Total - $5,000,000

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: Spring 2025 - Summer 2027. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
January 2025: Pre-design phase initiated.
April 25, 2025: Community-wide online survey went live
April 26, 2025: Spring Fling Booth
May 8, 2025: Public workshop held at Odessa High School
May 16, 2025: Online survey closed
August 29, 2025: Second community-wide online survey went live
September 12, 2025: Second online survey closed
May 2026: Pre-design phase completed

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2025 - Summer 2027. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, delivery, funding, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.