SR 27 – Enhanced Pedestrian Crossings in Spokane Valley

Spokane County, Washington · Transportation

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Develop up to three enhanced pedestrian crossings on SR 27/Pines Road in Spokane Valley, potentially including beacons, refuge islands, accessible ramps and lighting.

Technical scope

Develop up to three enhanced pedestrian crossings on SR 27/Pines Road in Spokane Valley, potentially including beacons, refuge islands, accessible ramps and lighting.

Agency-published project contact: Tim Curns, PE, PTOE | Traffic Engineer for Design | 509-309-9512 | tim.curns@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-27-enhanced-pedestrian-crossings-spokane-valley

Project type
Pedestrian, cycling and transit access improvements

Contacts

Recorded professional contact

Tim Curns, PE, PTOE | Traffic Engineer for Design | 509-309-9512 | tim.curns@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $575,000. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Funding program: Washington Climate Commitment Act. The reviewed section does not provide a project-specific funding amount.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
November 2025: Project awarded grant funding.
January 2026: Pre-design initiated.
July 2026: Survey conducted

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.