SR 27 – Enhanced Pedestrian Crossings in Spokane Valley
Spokane County, Washington · Transportation
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Develop up to three enhanced pedestrian crossings on SR 27/Pines Road in Spokane Valley, potentially including beacons, refuge islands, accessible ramps and lighting.
Technical scope
Develop up to three enhanced pedestrian crossings on SR 27/Pines Road in Spokane Valley, potentially including beacons, refuge islands, accessible ramps and lighting.
Agency-published project contact: Tim Curns, PE, PTOE | Traffic Engineer for Design | 509-309-9512 | tim.curns@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-27-enhanced-pedestrian-crossings-spokane-valley
- Project type
- Pedestrian, cycling and transit access improvements
Contacts
Recorded professional contact
Tim Curns, PE, PTOE | Traffic Engineer for Design | 509-309-9512 | tim.curns@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $575,000. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): Funding program: Washington Climate Commitment Act. The reviewed section does not provide a project-specific funding amount.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
November 2025: Project awarded grant funding.
January 2026: Pre-design initiated.
July 2026: Survey conducted
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: February 2026 - Summer 2027. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.