SR 203 / NE 124th St to Skykomish River – Paving with Exceptions Project

King County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSummer 2026: Construction scheduled to begin
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Spring 2027: Construction scheduled for completion

Overview

Preserve nearly 11 miles of SR 203 between Duvall and Monroe through pavement repairs and resurfacing, excluding a section through central Duvall.

Technical scope

Preserve nearly 11 miles of SR 203 between Duvall and Monroe through pavement repairs and resurfacing, excluding a section through central Duvall.

Agency-published project contact: Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-203-ne-124th-st-skykomish-river-paving-exceptions-project

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Elizabeth Mount | Communications | 206-482-2276 | elizabeth.mount@wsdot.wa.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT funding/budget summary: $7 .8 Million from Pre-existing Funds. This figure is not assumed to be a total project cost.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Summer 2026: Construction scheduled to begin
Recorded completion
Spring 2027: Construction scheduled for completion
Recorded milestones
Agency-listed project timeline: Spring 2026 – Winter 2026. Agency stage: Not started.
Agency milestone schedule (reviewed 2026-11-06):
Winter 2025: Design Phase
Spring 2026: Project advertised for competitive bidding
Summer 2026: Contractor selected
Summer 2026: Construction scheduled to begin
Spring 2027: Construction scheduled for completion

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2026 – Winter 2026. Agency stage: Not started. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, start, completion, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.