SR 18/Unnamed Tributary to Big Soos & Soosette Creek – Fish Passage
King County, Washington · Resilience and flood protection
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Winter 2029: Construction scheduled for completion.
Overview
Replace two culverts along SR 18 in Auburn to restore fish passage through tributaries of Big Soos and Soosette creeks.
Technical scope
Replace two culverts along SR 18 in Auburn to restore fish passage through tributaries of Big Soos and Soosette creeks.
Agency-published project contact: Eric Zackula | Communications | 206-586-1306 | eric.zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-18-unnamed-tributary-big-soos-soosette-creek-fish-passage
- Project type
- Fish passage and habitat restoration
Contacts
Recorded professional contact
Eric Zackula | Communications | 206-586-1306 | eric.zackula@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $135.91 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $135.91 million from Pre-Existing Funds (PEF), the Connecting Washington Account (CWA), Move Ahead Washington (MAW) and the State Motor Vehicle Account (MVA).
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Spring 2027: Construction scheduled to begin.
- Recorded completion
- Winter 2029: Construction scheduled for completion.
- Recorded milestones
- Agency-listed project timeline: Fall 2026 - Winter 2029. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Fall 2026: Project advertised for competitive bidding.
Winter 2026: Contractor selected.
Spring 2027: Construction scheduled to begin.
Winter 2029: Construction scheduled for completion.
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Fall 2026 - Winter 2029. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, completion, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.