SR 155 Spur/Okanogan River Bridge Replacement

Okanogan County, Washington · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSpring 2027: Construction begins
Project owner
Washington State Department of Transportation
Delivery method
Not verified
Expected completion
Not verified

Overview

Replace the Okanogan River bridge with a wider curved crossing carrying two travel lanes, shoulders, utilities and an accessible shared-use path. Add stormwater treatment and approach improvements.

Technical scope

Replace the Okanogan River bridge with a wider curved crossing carrying two travel lanes, shoulders, utilities and an accessible shared-use path. Add stormwater treatment and approach improvements.

Agency-published project contact: Sebastian Moraga | Communications | 509-667-3077 | sebastian.moraga@wsdot.wa.gov | Justin Hammond | Project Engineer | 509-667-2886 | justin.hammond@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/sr-155-spur-okanogan-river-bridge-replacement

Project type
Road, bridge and multimodal improvements

Contacts

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Previously recorded anticipated work

Planned agency procurement milestones; these are not verified open solicitations or bid deadlines. Spring 2027: Project advertisement

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Recorded funding
WSDOT summary lists $36.3 million; its funding detail identifies $29,371,289 from Connecting Washington. These amounts are not reconciled in this profile.
Agency funding detail (2026-11-06): This project is funded through Connecting Washington for $29,371,289.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Spring 2027: Construction begins
Recorded milestones
Agency-listed project timeline: Spring 2022-Fall 2028. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Spring 2022: Design and environmental review
Winter 2023: Public open house
Spring 2027: Project advertisement
Spring 2027: Construction begins
Fall 2028: Project Complete

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Spring 2022-Fall 2028. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, upcoming bids, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.