← Infraday Projects

INFRADAY PROJECTS

SR-100 (Moody Boulevard) at Commerce Parkway Safety Improvements

City of Bunnell, Florida · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$1,828,650 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Bunnell
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Bunnell for a $1,462,920 FY 2026 SS4A implementation grant. The project will design, permit, engineer, and construct safety improvements at State Road 100 (Moody Boulevard) and Commerce Parkway, including a fully signalized intersection, pedestrian signals, accessible pedestrian features, upgraded detection, high-visibility pavement markings, signage, and related roadway modifications.

Technical scope

The project will design, permit, engineer, and construct safety improvements at State Road 100 (Moody Boulevard) and Commerce Parkway, including a fully signalized intersection, pedestrian signals, accessible pedestrian features, upgraded detection, high-visibility pavement markings, signage, and related roadway modifications. The project addresses a high-speed, side-street stop-controlled intersection on a corridor identified in the Volusia-Flagler Vision Zero Safety Action Plan high-injury network. Between 2019 and 2023, the corridor had 495 crashes, including 18 killed or seriously injured crashes and 3 fatalities, and a fatal vulnerable road user crash occurred near the intersection in July 2023. Improvements are intended to reduce angle and crossing conflicts, improve visibility and predictability, and provide safer crossings for motorists and pedestrians. The application states the project implements countermeasures identified in the Action Plan and aligns with the Safe System Approach and Federal Highway Administration Proven Safety Countermeasures, including signalization, high-emphasis crosswalks, and signal timing and phasing improvements.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Bunnell; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$1,828,650 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$1,462,920 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.