infraday

Connecting infrastructure leaders since 2017.

THE BUSINESS OF
INFRASTRUCTURE
← Project Atlas

Ports and maritime, Highways and bridges, Transportation

Southport Entrance / McIntosh Road Realignment Study

Broward County, FL

Estimated value$3.85M
StageNot verified
Owner / developerBroward County
Last verified2026-10-25

Project overview

FY 2026 BUILD award scope: The project consists of a Project Development and Environment (PD&E) study to expand the Southport entrance at Port Everglades, including: the Griffin Road extension into Port Everglades (PEV); the relocation/reconfiguration of McIntosh Road; and coordination with the ongoing Intermodal Center project.

Scope
The project consists of a Project Development and Environment (PD&E) study to expand the Southport entrance at Port Everglades, including: the Griffin Road extension into Port Everglades (PEV); the relocation/reconfiguration of McIntosh Road; and coordination with the ongoing Intermodal Center project. The work includes: 1) Alternatives Analysis; 2) Environmental (PDE/NEPA); 3) Preliminary Engineering and Design; 4) Interagency Coordination; 5) Public Involvement. The goal is to develop a final, approved, and environmentally cleared project design that can proceed to the Final Design phase and eventually to construction.
Project type
Road — planning/design award scope
Reported investment / scope
$3,850,000 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.
Funding sources
$3,080,000 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Delivery method
Not available

Organizations involved

Owner / developer
Broward County
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
Not available

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
Not available
Dated milestones
Not available
Permitting
Not available
Recent project updates
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

FY 2026 BUILD award scope: The project consists of a Project Development and Environment (PD&E) study to expand the Southport entrance at Port Everglades, including: the Griffin Road extension into Port Everglades (PEV); the relocation/reconfiguration of McIntosh Road; and coordination with the ongoing Intermodal Center project.

Funded scope

The project consists of a Project Development and Environment (PD&E) study to expand the Southport entrance at Port Everglades, including: the Griffin Road extension into Port Everglades (PEV); the relocation/reconfiguration of McIntosh Road; and coordination with the ongoing Intermodal Center project. The work includes: 1) Alternatives Analysis; 2) Environmental (PDE/NEPA); 3) Preliminary Engineering and Design; 4) Interagency Coordination; 5) Public Involvement. The goal is to develop a final, approved, and environmentally cleared project design that can proceed to the Final Design phase and eventually to construction.

Funding at award

$3,850,000 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.

$3,080,000 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.

Source and verification

Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.

USDOT awarded-projects publication · Official awards workbook

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.