← Infraday Projects

INFRADAY PROJECTS

Southeastern Public Service Authority (SPSA) interchange improvements, Suffolk

Suffolk, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$39.2 million (agency estimate) Agency cost detail (2026-11-06): Total construction value: $30.01 million. Components are not separate contract awards.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSummer 2024
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Late 2026

Overview

Build a flyover from eastbound Route 13/58/460 to the SPSA landfill entrance in Suffolk, removing the existing median-crossing conflict.

Technical scope

Build a flyover from eastbound Route 13/58/460 to the SPSA landfill entrance in Suffolk, removing the existing median-crossing conflict.
Agency project references: UPC: 118375; State ID: 0058-133-459.

Agency-published project contact: VDOT Communications | Hampton Roads district | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3032
Contact source: https://www.vdot.virginia.gov/projects/hampton-roads-district/southeastern-public-service-authority-spsa-interchange-improvements-project/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

VDOT Communications | Hampton Roads district | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3032

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$39.2 million (agency estimate)
Agency cost detail (2026-11-06): Total construction value: $30.01 million. Components are not separate contract awards.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Summer 2024
Recorded completion
Late 2026
Recorded milestones
Agency status: Under construction. Agency schedule entry: Summer 2024. Estimated completion: Late 2026.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Summer 2024. Estimated completion: Late 2026. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, scope, value. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.