← Infraday Projects

INFRADAY PROJECTS

Seminole County Intelligent Intersection Technology for Public Safety

Seminole County, Florida · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$9,465,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Seminole County
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected Seminole County for a $7,572,000 FY 2026 SS4A implementation grant. The project will deploy intelligent transportation systems safety infrastructure at 419 County-operated signalized intersections and enhanced safety analytics at 175 high-risk intersections on the high-injury network.

Technical scope

The project will deploy intelligent transportation systems safety infrastructure at 419 County-operated signalized intersections and enhanced safety analytics at 175 high-risk intersections on the high-injury network. The project addresses a severe concentration of crashes at signalized intersections: between 2019 and 2023, 17,392 crashes occurred within 250 feet of these intersections, including 328 people killed or seriously injured, which represented 60.1% of intersection KSI in the county. Countywide improvements include 287 Connected Vehicle Roadside Units, 169 Closed-Circuit Television cameras, and 180 Uninterruptible Power Supply systems to complete full coverage across all signalized intersections. Enhanced installations at 175 high-injury network intersections include 137 Intersection Movement Count cameras and 175 Integrated Safety Modules to identify near misses, monitor multimodal conflicts, and support targeted operational changes such as protected left-turn phasing and leading pedestrian intervals. The project will strengthen post-crash care coordination, incident detection, emergency vehicle signal preemption, and signal resiliency while creating a countywide platform aligned with the Safe System Approach and FHWA Proven Safety Countermeasures. This project includes Planning and Demonstration funds to update the Action Plan with a Connected Vehicle Strategy, develop a Near-Miss Data Utilization Plan, and conduct a law enforcement signal preemption pilot. These supplemental planning activities will establish governance, performance measures, and deployment priorities for connected vehicle and near-miss data, while the demonstration activity will test law enforcement use of signal preemption and evaluate safety and response-time impacts.

Project type
Road safety systems and operations

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: Seminole County; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$9,465,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$7,572,000 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.