Safety Starts at Schools – City of Fort Collins

City of Fort Collins, Colorado · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$6,535,388 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Fort Collins
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Fort Collins for a $5,228,310 FY 2026 SS4A implementation grant. The project will implement systemic safety improvements on a 2.5-mile segment of Shields Street and strengthen post-crash care capabilities citywide.

Technical scope

The project will implement systemic safety improvements on a 2.5-mile segment of Shields Street and strengthen post-crash care capabilities citywide. The project will complete design and construction of countermeasures at up to 12 signalized intersections, up to 18 intersections and select midblock locations, up to 4 bus stop locations, and up to 2 new crossings to address turning and pedestrian crash patterns on this high-injury network corridor. Between 2020 and 2024, this corridor experienced 786 crashes, including 2 fatal crashes, 20 serious injury crashes, 58 crashes involving people walking or biking, and 9 serious or fatal approach-turn crashes. Improvements include signal timing and phasing upgrades, high-visibility markings, directional curb ramps, bus stop relocations, and new crossings, consistent with FHWA Proven Safety Countermeasures and the Safe System Approach. The award will also fund emergency medical services training equipment, traffic incident management training, and equipment to expand a prehospital whole blood program to 3 additional ambulances, improving survivability after severe roadway crashes. This project includes Planning and Demonstration funds to conduct 30 school safety studies and a truck parking study. The school safety studies will assess conditions near schools, analyze crash and travel data, and identify near-term and long-term safety improvements. The truck parking study will evaluate options near I-25 to reduce unsafe stopping and inform updates to the Action Plan.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Fort Collins; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$6,535,388 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$5,228,310 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.