← Infraday Projects

INFRADAY PROJECTS

Safer Streets for Seattle: Addressing Our City’s Evolving Roadway Safety Needs

City of Seattle, Washington · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$12,535,588 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Seattle
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Seattle for a $9,675,459 FY 2026 SS4A implementation grant. The project will implement safety improvements at 6 high-injury network locations through high-friction surface treatment on 4 corridors and signalized intersection upgrades at 2 intersections.

Technical scope

The project will implement safety improvements at 6 high-injury network locations through high-friction surface treatment on 4 corridors and signalized intersection upgrades at 2 intersections. The project addresses roadway departure, wet-weather, red-light running, and pedestrian crash risks that contribute to fatal and serious injury crashes, especially during low-light and winter conditions. Planned work includes high-friction surface treatment on Rainier Avenue South, Highland Park Way Southwest, Southwest Roxbury Street and Olson Place Southwest, and Westlake Avenue North, plus signal rebuilds at 4th Avenue South and South Main Street and 4th Avenue South and South Jackson Street with 12-inch signal heads, retroreflective backplates, accessible pedestrian signals, emergency vehicle preemption, and longer leading pedestrian intervals. Between 2019 and 2023, the 4 high-friction surface treatment locations recorded 231 total crashes and the 2 intersections recorded 73 total crashes, including multiple serious injury and fatal crashes. The countermeasures align with the Safe System Approach and Federal Highway Administration Proven Safety Countermeasures, with cited crash reduction benefits including high-friction surface treatment for wet-weather and roadway departure crashes and leading pedestrian intervals for pedestrian safety. The project is expected to improve visibility, traction, and signal operations to reduce killed or seriously injured outcomes on these corridors and intersections. This project includes Planning and Demonstration funds to update Seattle’s proactive safety analysis using 15 years of crash, roadway design, and user behavior data. The supplemental planning activities will identify risk factors at arterial intersections and major roadway segments, correlate them with cost-effective countermeasures, and evaluate emerging technologies such as near-miss camera tools and adaptive traffic controls.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Seattle; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$12,535,588 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$9,675,459 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.