← Infraday Projects

INFRADAY PROJECTS

Safe Streets for Dickson – City of Dickson

City of Dickson, Tennessee · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$6,000,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Dickson
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Dickson for a $4,800,000 FY 2026 SS4A implementation grant. The project will implement low-cost, high-impact safety improvements across 8 corridors identified in its Action Plan high-injury network.

Technical scope

The project will implement low-cost, high-impact safety improvements across 8 corridors identified in its Action Plan high-injury network. Between 2019 and 2023, the city recorded 3,008 roadway crashes, including 72 killed or seriously injured crashes, and the selected corridors were prioritized based on fatal and serious injury crash history, crash rates, and risk factors. The project will add and close gaps in sidewalks, upgrade crosswalks and pedestrian refuge features, install flashing yellow arrows, signal backplates, rumble strips, raised pavement markers, curve warning signs, and targeted signing and striping, and reconfigure one 4-lane segment to 3 lanes with a center turn lane. Work includes approximately 4,670 feet of new sidewalk, improvements at multiple signalized and stop-controlled intersections, and corridor signal timing updates. These countermeasures align with the Safe System Approach and include FHWA Proven Safety Countermeasures, with corridor-level crash reductions estimated as high as 38% over 5 years.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Dickson; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$6,000,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$4,800,000 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.