Route BB Bridge / Loop 35 Interchange Project

City of Cameron, Missouri · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$15,000,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Cameron
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Cameron for a $12,000,000 FY 2026 SS4A implementation grant. The project will replace the Route BB Bridge and reconfigure the Route BB and Loop 35 interchange over Interstate 35 with a large roundabout, ramp extensions, and pedestrian accommodations.

Technical scope

The project will replace the Route BB Bridge and reconfigure the Route BB and Loop 35 interchange over Interstate 35 with a large roundabout, ramp extensions, and pedestrian accommodations. The project addresses an aging 1964 interchange that now carries higher traffic volumes and heavy truck traffic, creating congestion, limited clearance, short ramp distances, and elevated crash risk near Cameron Regional Medical Center. Between 2018 and 2023, 27 crashes occurred on BB Bridge, and the city identified this location as a top priority in its Action Plan. The design will reduce conflict points, moderate speeds, and simplify vehicle movements, consistent with the Safe System Approach and Federal Highway Administration Proven Safety Countermeasures. The project will maintain the existing bridge during construction to preserve reliable hospital and emergency access.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Cameron; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$15,000,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$12,000,000 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.