Route 460/121 Poplar Creek Phase B (Buchanan County)

Buchanan County, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueApproximately $207 million (agency estimate)
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startWinter 2021
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Summer 2027

Overview

Construct the final two-mile Poplar Creek Phase B section of Route 460/121, including a four-lane roadway and a high bridge over the railway and Levisa Fork.

Technical scope

Construct the final two-mile Poplar Creek Phase B section of Route 460/121, including a four-lane roadway and a high bridge over the railway and Levisa Fork.
Agency project references: UPC: 117808/118490; State ID: 0460-013-986,P101, R201/0460-013-979,B639, C501, P101, R201; Federal ID:.

Agency-published project contact: Zac Bailey | Project manager | laura.hale@vdot.virginia.gov | 276-669-6151
Contact source: https://www.vdot.virginia.gov/projects/bristol-district/corridor-q-route-460121-poplar-creek-phase-b-buchanan-county/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Zac Bailey | Project manager | laura.hale@vdot.virginia.gov | 276-669-6151

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
Approximately $207 million (agency estimate)

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Winter 2021
Recorded completion
Summer 2027
Recorded milestones
Agency status: Under construction. Agency schedule entry: Winter 2021. Estimated completion: Summer 2027.
Agency public-involvement record: Location and design public meeting A virtual location and design public meeting for the project was held summer 2021.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Winter 2021. Estimated completion: Summer 2027. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, scope, milestones. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.