Route 311 (Harville-Saunders Parkway) connector road extension

Pittsylvania County, Virginia · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$36 Million (agency estimate)
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startTo be determined
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Winter 2027

Overview

Widen about 2.3 miles of Route 311/Berry Hill Road to a divided four-lane route supporting the Southern Virginia Mega Site, with drainage and utility work.

Technical scope

Widen about 2.3 miles of Route 311/Berry Hill Road to a divided four-lane route supporting the Southern Virginia Mega Site, with drainage and utility work.
Agency project references: UPC: 119164; State ID: 0311-071-835, C501, D648, D649, P101, R201.

Agency-published project contact: Amanda Cox, DBIA | Project manager | amanda.cox@vdot.virginia.gov | 276-701-2782
Contact source: https://www.vdot.virginia.gov/projects/lynchburg-district/route-311-berry-hill-road-connector-road-extension/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Amanda Cox, DBIA | Project manager | amanda.cox@vdot.virginia.gov | 276-701-2782

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$36 Million (agency estimate)

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
To be determined
Recorded completion
Winter 2027
Recorded milestones
The agency lists Under construction, but its start date remains to be determined. Estimated completion: winter 2027. This profile uses Planning pending confirmation of physical work.
Agency public-involvement record: Willingness Ad posted February 21, 2023, and March 1, 2023

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. The agency lists Under construction, but its start date remains to be determined. Estimated completion: winter 2027. This profile uses Planning pending confirmation of physical work. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, scope, milestones. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.