Route 29 (Wards Road) and Route 699 (Gladys Road) intersection improvement project

Campbell County, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$5.4 Million (agency estimate) Agency cost detail (2026-11-06): Construction contract value: $3,236,739. Components are not separate contract awards.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startFall 2025
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Fall 2026

Overview

Reconfigure the Route 29/Gladys Road intersection with a restricted-crossing U-turn layout, raised islands, drainage work and relocated warning flashers.

Technical scope

Reconfigure the Route 29/Gladys Road intersection with a restricted-crossing U-turn layout, raised islands, drainage work and relocated warning flashers.
Agency project references: UPC: 115488; State ID: 6029-015-825, P101; Federal ID: NHPP-015-3(100).

Agency-published project contact: Anthony W. Revelle, P.E. | Project manager | anthony.revelle@vdot.virginia.gov | 434-856-8258
Contact source: https://www.vdot.virginia.gov/projects/lynchburg-district/route-29-wards-road-and-route-699-gladys-road-intersection-improvement-project/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Anthony W. Revelle, P.E. | Project manager | anthony.revelle@vdot.virginia.gov | 434-856-8258

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$5.4 Million (agency estimate)
Agency cost detail (2026-11-06): Construction contract value: $3,236,739. Components are not separate contract awards.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Fall 2025
Recorded completion
Fall 2026
Recorded milestones
Agency status: Under construction. Agency schedule entry: Fall 2025. Estimated completion: Fall 2026.
Agency public-involvement record: Willingness public hearing A willingness public hearing about this project will be held on Tuesday, April 4, 2023, from 4-6 p.m. at the Altavista Train Station, 414 Washington St., Altavista, VA 24517. Route 29 and Route 699 Improvement Project 4-page Brochure TwoColumnAdRoute29and699Intersection

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Fall 2025. Estimated completion: Fall 2026. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, scope, value, milestones. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.