Route 29 Business intersection safety improvements, Amherst County

Amherst County, Virginia · Transportation, Highways and bridges

Stage: PlanningProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$6.1 Million (agency estimate) Agency cost detail (2026-11-06): Total cost: $1.6 million; Preliminary engineering: $497,000; Right of way and utilities: $401,000; Construction: $697,000; Total cost: $2.2 Million; Preliminary engineering: $495,000; Right of way and utilities: $429,000; Construction: $1.26 Million; Total cost: $2.3 Million; Preliminary engineering: $570,000; Right of way and utilities: $282,000; Construction: $1.45 million. Components are not separate contract awards.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSpring 2027
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Summer 2028

Overview

Add a northbound right-turn lane on Business 29 at Seminole Drive, replace sidewalk and improve the signalized pedestrian crossing in Amherst County.

Project type
Road, bridge and multimodal improvements

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$6.1 Million (agency estimate)
Agency cost detail (2026-11-06): Total cost: $1.6 million; Preliminary engineering: $497,000; Right of way and utilities: $401,000; Construction: $697,000; Total cost: $2.2 Million; Preliminary engineering: $495,000; Right of way and utilities: $429,000; Construction: $1.26 Million; Total cost: $2.3 Million; Preliminary engineering: $570,000; Right of way and utilities: $282,000; Construction: $1.45 million. Components are not separate contract awards.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Spring 2027
Recorded completion
Summer 2028
Recorded milestones
Construction is scheduled to start in spring 2027 and finish in summer 2028. The agency status field says Under construction; this profile uses Planning because physical work has not been confirmed.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Construction is scheduled to start in spring 2027 and finish in summer 2028. The agency status field says Under construction; this profile uses Planning because physical work has not been confirmed. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded latitude, longitude, value. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.