← Infraday Projects

INFRADAY PROJECTS

Route 13 at Route 648 Restricted Crossing U-turn (RCUT)

Accomack County; Accomac, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueAgency cost detail (2026-11-06): $4.29 million. Components are not separate contract awards.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSpring 2026
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Early 2027

Overview

Convert the Route 13/Daugherty Road intersection to a restricted-crossing U-turn layout with median turn lanes and widened areas for larger vehicles.

Technical scope

Convert the Route 13/Daugherty Road intersection to a restricted-crossing U-turn layout with median turn lanes and widened areas for larger vehicles.

Agency-published project contact: Hampton Roads District Communications | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3024
Contact source: https://www.vdot.virginia.gov/projects/hampton-roads-district/route-13-at-route-648-rcut/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Hampton Roads District Communications | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3024

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
Agency cost detail (2026-11-06): $4.29 million. Components are not separate contract awards.
Recorded funding
$4.29 million construction contract awarded to Branscome Operating, LLC; total project cost not separately established.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Spring 2026
Recorded completion
Early 2027
Recorded milestones
Agency status: Under construction. Agency schedule entry: Spring 2026. Estimated completion: Early 2027.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Spring 2026. Estimated completion: Early 2027. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, value, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.