INFRADAY PROJECTS
Route 13 at Route 648 Restricted Crossing U-turn (RCUT)
Accomack County; Accomac, Virginia · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Virginia Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Early 2027
Overview
Convert the Route 13/Daugherty Road intersection to a restricted-crossing U-turn layout with median turn lanes and widened areas for larger vehicles.
Technical scope
Convert the Route 13/Daugherty Road intersection to a restricted-crossing U-turn layout with median turn lanes and widened areas for larger vehicles.
Agency-published project contact: Hampton Roads District Communications | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3024
Contact source: https://www.vdot.virginia.gov/projects/hampton-roads-district/route-13-at-route-648-rcut/
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Hampton Roads District Communications | hamptonroadspublicinfo@vdot.virginia.gov | 757-956-3024
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- Agency cost detail (2026-11-06): $4.29 million. Components are not separate contract awards.
- Recorded funding
- $4.29 million construction contract awarded to Branscome Operating, LLC; total project cost not separately established.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Spring 2026
- Recorded completion
- Early 2027
- Recorded milestones
- Agency status: Under construction. Agency schedule entry: Spring 2026. Estimated completion: Early 2027.
Documents & Resources
- Virginia Department of Transportation official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Spring 2026. Estimated completion: Early 2027. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, value, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.