Route 122 Regional Corridor Plan

Franklin and Bedford counties, VA

Estimated value$1.66M
StageNot verified
Owner / developerWest Piedmont Planning District Commission
Last verified2026-10-25

Project overview

FY 2024 RAISE award scope: This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County.

Scope
This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County. The plan will recommend safety, capacity, and geometric improvements, as well as examine the feasibility of a corridor-wide multi-use trail, corridor-wide connectivity and redundancy - including multimodal options spanning a lake, a park-and-ride facility with EV charging stations, elements of Complete Streets where feasible, and a shuttle between the corridor and nearby Amtrak stations. The plan will also incorporate recommendations from one previous and one current planning effort in the Westlake Corner community of Franklin County.
Project type
Road — planning/design award scope
Reported investment / scope
$1,657,148 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
Funding sources
$1,657,148 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Delivery method
Not available

Organizations involved

Owner / developer
West Piedmont Planning District Commission
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
Not available

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
Not available
Dated milestones
Not available
Permitting
Not available
Recent project updates
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

FY 2024 RAISE award scope: This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County.

Funded scope

This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County. The plan will recommend safety, capacity, and geometric improvements, as well as examine the feasibility of a corridor-wide multi-use trail, corridor-wide connectivity and redundancy – including multimodal options spanning a lake, a park-and-ride facility with EV charging stations, elements of Complete Streets where feasible, and a shuttle between the corridor and nearby Amtrak stations. The plan will also incorporate recommendations from one previous and one current planning effort in the Westlake Corner community of Franklin County.

Funding at award

$1,657,148 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.

$1,657,148 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.

Source and verification

Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.

USDOT awarded-projects publication · Official awards workbook

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.