Transportation, Highways and bridges
Route 122 Regional Corridor Plan
Franklin and Bedford counties, VA
Project overview
FY 2024 RAISE award scope: This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County.
- Scope
- This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County. The plan will recommend safety, capacity, and geometric improvements, as well as examine the feasibility of a corridor-wide multi-use trail, corridor-wide connectivity and redundancy - including multimodal options spanning a lake, a park-and-ride facility with EV charging stations, elements of Complete Streets where feasible, and a shuttle between the corridor and nearby Amtrak stations. The plan will also incorporate recommendations from one previous and one current planning effort in the Westlake Corner community of Franklin County.
- Project type
- Road — planning/design award scope
- Reported investment / scope
- $1,657,148 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
- Funding sources
- $1,657,148 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- West Piedmont Planning District Commission
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2024 RAISE award scope: This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County.
Funded scope
This project will fund the development of an approximately 24.2-mile corridor plan along Route 122 from Wirtz Road (Route 697) in Franklin County and Jopa Mill Road (Route 747) in Bedford County. The plan will recommend safety, capacity, and geometric improvements, as well as examine the feasibility of a corridor-wide multi-use trail, corridor-wide connectivity and redundancy – including multimodal options spanning a lake, a park-and-ride facility with EV charging stations, elements of Complete Streets where feasible, and a shuttle between the corridor and nearby Amtrak stations. The plan will also incorporate recommendations from one previous and one current planning effort in the Westlake Corner community of Franklin County.
Funding at award
$1,657,148 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
$1,657,148 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in