INFRADAY PROJECTS · 0171-0514
D1 Signals APS Upgrades — Berlin, Bloomfield, Bristol, East Windsor, Meriden, Middletown, New Britain, Newington, Plainville, Somers, South Windsor, Southington, Vernon, Windsor (CTDOT 0171-0514)
Berlin, Bloomfield, Bristol, East Windsor, Meriden, Middletown, New Britain, Newington, Plainville, Somers, South Windsor, Southington, Vernon, Windsor, Connecticut · Transportation
Material research update: 2026-11-20 · Source research checked: 2026-11-20
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Connecticut Department of Transportation (managing agency)
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Provide accessible pedestrian signals (APS), countdown signal heads, sidewalk ramps, and leading pedestrian intervals (as appropriate) at various state maintained traffic control signals in District 1. FAP # 000T(663)
- Agency project reference
- 0171-0514
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Design progress
- 66% recorded design completion
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Additional scope
- Provide accessible pedestrian signals (APS), countdown signal heads, sidewalk ramps, and leading pedestrian intervals (as appropriate) at various state maintained traffic control signals in District 1. FAP # 000T(663)
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Project type
- Capital infrastructure project
- Recorded constraints and uncertainties
- No open solicitation or bid deadline is verified for this record. Confirm procurement requirements with the relevant agency before pursuing a contract.
Contacts
Balazs L. Szoke
Project manager · CTDOT project team
Project manager identified in the official project record
Balazs.Szoke@ct.govVerified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Claire C Sylvestre
Project lead engineer · CTDOT project team
Project lead engineer identified in the official project record
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
Planned / Forecast
CTDOT records 2027-06-23 as the forecast advertisement date. No current solicitation document, submission deadline or awarded contract package was verified in this research.
- Qualification requirements
- CTDOT requires prime contractors bidding directly on its advertised construction projects to be prequalified and approved for the specific bid proposal. CTDOT does not require subcontractors to obtain that prime-bidder prequalification. Confirm the actual solicitation and project delivery authority before applying these general rules.
Verified · Connecticut Department of Transportation ↗ · Checked 2026-11-15
Additional scope-based business-development research is available with authorized Infraday+ access.
Companies Involved
- Recorded organizations
- Connecticut Department of Transportation (managing agency)
Specific roles and award relationships remain subject to source verification.
Budget & Funding
| Meaning | Amount | Basis |
|---|---|---|
| Total project estimate | USD 7,343,000 | CTDOT inventory, source snapshot 2026-11-04 Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Current construction estimate | USD 5,802,000 | CTDOT inventory, source snapshot 2026-11-04 Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Recorded preliminary engineering expenditure | USD 946,147 | CTDOT inventory, source snapshot 2026-11-04 Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Recorded right-of-way expenditure | USD 858 | CTDOT inventory, source snapshot 2026-11-04 Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
Agency forecast advertisement
Projected, not a published tender
Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Documents & Resources
Official agency project inventory
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Agency bidding guidance
Verified · Connecticut Department of Transportation ↗ · Checked 2026-11-15
Updates & Intelligence
Verified research changes
CTDOT project detail
CTDOT figures as of 2026-11-19: construction estimate $5,802,000, preliminary engineering expenditures $965,498, right-of-way expenditures $3,499. 2026-11-19 | CTDOT reported design 69% complete.
Change source ↗Research expanded from the official agency record
Added source-attributed contacts, separate cost meanings and forecast milestones. This research addition does not indicate a newly advertised or awarded contract.
Change source ↗Earlier recorded updates
2026-11-15: Added from official agency inventory. CTDOT lists the schedule phase as 03 Final-Design. Source snapshot: 2026-11-04. Project estimates and schedules can change.
2026-11-20 | CTDOT figures as of 2026-11-19: construction estimate $5,802,000, preliminary engineering expenditures $965,498, right-of-way expenditures $3,499. 2026-11-19 | CTDOT reported design 69% complete.