INFRADAY PROJECTS · 0103-0278
Safety Imprv at Sturtevant St — Norwich (CTDOT 0103-0278)
Norwich, Connecticut · Transportation
Material research update: 2026-11-20 · Source research checked: 2026-11-20
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Connecticut Department of Transportation (managing agency)
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Replace substandard three-cable guiderail with a MASH compliant rail system and improve highway geometry on SR 642 at Sturtevant Street in Norwich (between mile points 1.74 - 1.97). FA# 1103(115)
- Agency project reference
- 0103-0278
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Design progress
- 100% recorded design completion
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Additional scope
- Replace substandard three-cable guiderail with a MASH compliant rail system and improve highway geometry on SR 642 at Sturtevant Street in Norwich (between mile points 1.74 - 1.97). FA# 1103(115)
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
- Project type
- Capital infrastructure project
- Recorded constraints and uncertainties
- No open solicitation or bid deadline is verified for this record. Confirm procurement requirements with the relevant agency before pursuing a contract.
Contacts
Kevin Blasi
Project manager · Connecticut Department of Transportation
Public project-information contact identified by the agency. Use the designated bidding channel once a solicitation is issued.
Kevin.Blasi@ct.govVerified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Mikhail Thomas
Project lead engineer · Connecticut Department of Transportation
Public project-information contact identified by the agency. Use the designated bidding channel once a solicitation is issued.
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
This agency project record does not establish a currently open solicitation, a bid deadline or a specific unawarded contract package.
Additional scope-based business-development research is available with authorized Infraday+ access.
Companies Involved
CJ Fucci Construction
Contractor listed by CTDOT
Agency-listed relationship; award date, amount and contract package not independently verified
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Budget & Funding
| Meaning | Amount | Basis |
|---|---|---|
| Total project estimate | USD 10,441,279 | CTDOT inventory dated 2026-11-04 Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Construction estimate | USD 8,458,779 | CTDOT inventory dated 2026-11-04 Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Recorded preliminary engineering expenditure | USD 1,497,902 | CTDOT inventory dated 2026-11-04 Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Recorded right-of-way expenditure | USD 188,582 | CTDOT inventory dated 2026-11-04 Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
| Recorded construction expenditure | USD 28,717 | CTDOT inventory dated 2026-11-04 Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15 |
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
Forecast advertisement
Projected; confirm current schedule
Projected · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Documents & Resources
Agency inventory; retrieved 2026-11-15
Verified · Connecticut Department of Transportation ↗ · Source 2026-11-04 · Checked 2026-11-15
Updates & Intelligence
Verified research changes
CTDOT project detail
CTDOT figures as of 2026-11-19: construction estimate $8,458,779, preliminary engineering expenditures $1,497,902, right-of-way expenditures $188,894, construction expenditures $38,038. 2026-11-19 | CTDOT reported design 100% complete.
Change source ↗Official-source research expanded
Added source-attributed project details. This enrichment is a research event, not a newly announced project, solicitation or award.
Change source ↗Earlier recorded updates
2026-11-15: Added from official agency inventory. CTDOT lists the schedule phase as 05 Construction (Pending). Source snapshot: 2026-11-04. Project estimates and schedules can change. The source labels construction as pending; work underway is not verified.
2026-11-20 | CTDOT figures as of 2026-11-19: construction estimate $8,458,779, preliminary engineering expenditures $1,497,902, right-of-way expenditures $188,894, construction expenditures $38,038. 2026-11-19 | CTDOT reported design 100% complete.