Pawnee Solar & BESS
Morgan County, Colorado · Renewable energy
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Public Service Co of Colorado
- Delivery method
- Not verified
- Expected completion
- December 2027 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Overview
EIA's September 2026 inventory reports 200 MW batteries; 250 MW solar photovoltaic in planned units at Pawnee Solar & BESS, Morgan County, Colorado.
Technical scope
EIA plant IDs: 70462. Planned units are grouped as one project; existing operating units are outside this scope.
Plant 70462, generator PAWB: Batteries; nameplate 200 MW; net summer 200 MW; net winter 200 MW; planned operation December 2027; (U) Under construction, less than or equal to 50 percent complete.
Plant 70462, generator PAWS: Solar Photovoltaic; nameplate 250 MW; net summer 250 MW; net winter 250 MW; planned operation December 2027; (U) Under construction, less than or equal to 50 percent complete.
- Project type
- Batteries / Solar Photovoltaic
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- EIA reporting entities: Public Service Co of Colorado; balancing authority code(s): PSCO
Specific roles and award relationships remain subject to source verification.
Budget & Funding
Project cost and funding have not yet been verified.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded completion
- December 2027 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Documents & Resources
- EIA September 2026 Preliminary Monthly Electric Generator Inventory, Planned worksheet ↗Released 2026-10-23; reviewed 2026-11-08Plant IDs 70462; worksheet rows 1404, 1405; reporting entity, location, capacity, unit status and planned operation
- EIA release and methodology ↗Released 2026-10-23Preliminary data and scope
Updates & Intelligence
Earlier recorded updates
2026-11-08: Newly indexed from EIA. Status and dates reflect the September 2026 preliminary inventory, released October 23, 2026. The project stage reflects the most advanced reported unit. Capacities are preliminary and are separated by technology; generation and battery ratings must not be treated as simultaneous site export capacity. EIA reporting entities are not independently verified ultimate owners. Project costs, contractors and procurement are not established by this dataset.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.