INFRADAY PROJECTS
Pathways to Safety: Eliminating Conflict, Enhancing Mobility
City of Spring Hill, Kansas · Transportation, Highways and bridges
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- City of Spring Hill
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
USDOT selected City of Spring Hill for a $2,805,386 FY 2026 SS4A implementation grant. The project will implement safety improvements along the 215th Street and South Street corridor from Webster Road to U.S.
Technical scope
The project will implement safety improvements along the 215th Street and South Street corridor from Webster Road to U.S. 169, including intersection reconfiguration, sidewalk construction, and enhanced crossings. The project will reconfigure the U.S. 169 and 215th Street and South Street intersection as a reduced conflict intersection using channelizing medians and delineators to eliminate left-turn movements from the minor street, a treatment aligned with FHWA Proven Safety Countermeasures. It will also construct a continuous sidewalk along the north side of the corridor and add high-visibility crosswalks, rectangular rapid-flashing beacons, pedestrian lighting, and advance signage at Lone Elm Road and Madison Street. Between 2019 and 2023, the project area experienced 11 injury and fatal crashes, including 1 fatal crash and 3 serious injury crashes, and 64% were angle-side impact crashes. The corridor is on the City’s high-injury network and high-risk network, and the improvements are intended to reduce severe turning and crossing conflicts while creating a continuous pedestrian route to schools, businesses, parks, and neighborhoods.
- Project type
- Road safety infrastructure
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- Lead applicant: City of Spring Hill; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $3,506,733 total project cost in the FY 2026 award record; award-time scope and estimate.
- Recorded funding
- $2,805,386 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- 2026-10-30: FY 2026 SS4A award announced.
Documents & Resources
- USDOT FY 2026 SS4A full award list ↗2026-10-30Applicant, project scope, state, grant type, federal award and total project cost
- USDOT FY26 SS4A award workbook ↗2026-10-30Project: Pathways to Safety: Eliminating Conflict, Enhancing Mobility; applicant: City of Spring Hill
Updates & Intelligence
Earlier recorded updates
2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.